Min-max regret criterion-based robust model for the permutation flow-shop scheduling problem

被引:14
作者
Liao, Wenzhu [1 ]
Fu, Yanxiang [1 ]
机构
[1] Chongqing Univ, Dept Ind Engn, Chongqing, Peoples R China
基金
中国国家自然科学基金;
关键词
Permutation flow shop; robust scheduling; uncertainty; min-max regret; directed graph; BEE COLONY ALGORITHM; HEURISTIC ALGORITHM; M-MACHINE; N-JOB; SHOP; MINIMIZATION; BENCHMARKS; TIME;
D O I
10.1080/0305215X.2019.1607848
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article studies the permutation flow-shop scheduling problem (PFSP) with interval production time. A min-max regret criterion-based robust scheduling model is established by taking both the robustness of total completion time and the tardiness of production into consideration simultaneously. To decrease the infinite number of scenarios to a limited level, a directed graph tool is applied to conduct worst case scenario analysis. In addition, since the PFSP is proved to be NP hard, a genetic algorithm is implemented to solve this robust scheduling model. Experimental simulation results verify the effectiveness and efficiency of this model. Moreover, it could cover the drawback of the traditional uncertain scheduling models, which consider only the robustness of total completion time. This could help manufacturing enterprises to increase time delivery capability so as to enhance downstream customers' satisfaction.
引用
收藏
页码:687 / 700
页数:14
相关论文
共 23 条
  • [1] The two stage assembly flowshop scheduling problem to minimize total tardiness
    Allahverdi, Ali
    Aydilek, Harun
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (02) : 225 - 237
  • [2] CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
  • [3] Heuristic algorithms for the minmax regret flow-shop problem with interval processing times
    Cwik, Michal
    Jozefczyk, Jerzy
    [J]. CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2018, 26 (01) : 215 - 238
  • [4] EVOLUTIONARY ALGORITHM FOR MINMAX REGRET FLOW-SHOP PROBLEM
    Cwik, Michal
    Jozefczyk, Jerzy
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2015, 6 (03) : 3 - 9
  • [5] Benchmarks for shop scheduling problems
    Demirkol, E
    Mehta, S
    Uzsoy, R
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) : 137 - 141
  • [6] Drwal M., 2017, INT C OPT DEC SCI, P611
  • [7] Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times
    Feng, Xin
    Zheng, Feifeng
    Xu, Yinfeng
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) : 3706 - 3717
  • [8] FLOW-SHOP AND JOB-SHOP SCHEDULES - COMPLEXITY AND APPROXIMATION
    GONZALEZ, T
    SAHNI, S
    [J]. OPERATIONS RESEARCH, 1978, 26 (01) : 36 - 52
  • [9] Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time
    Hu, Hongtao
    Ng, K. K. H.
    Qin, Yichen
    [J]. SCIENTIFIC PROGRAMMING, 2016, 2016
  • [10] A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion
    Kasperski, Adam
    Zielinski, Pawel
    [J]. OPERATIONS RESEARCH LETTERS, 2008, 36 (03) : 343 - 344