A Lagrangian heuristic algorithm for sustainable supply chain network considering CO2 emission

被引:16
作者
Zheng, Meimei [1 ]
Li, Wei [2 ]
Liu, Ye [1 ]
Liu, Xiao [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Ind Engn, Shanghai, Peoples R China
[2] Univ Kentucky, Mech Engn, Lexington, KY 40506 USA
基金
中国国家自然科学基金;
关键词
Production planning; Stochastic programming; Lagrangian heuristic; Sustainability; Service level; LOT-SIZING PROBLEM; OPTIMIZATION; CAPACITY; MODELS; SYSTEM;
D O I
10.1016/j.jclepro.2020.122409
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Manufacturing companies encounter pressure related to not only cost and service level but also certain limitations based on the constraints of energy saving and emission reduction. This study investigates production planning for a sustainable supply chain, for which factors such as the limits for CO2 emission, stochastic demands, service level, and inventory capacities are considered. We build a mixed-integer programming model and propose a Lagrangian relaxation (LR) algorithm to solve the large-scale production planning problem in a cost-efficient way. Based on the historical data of HY Automobile Co. in China and 120 randomly generated instances, we find that the LR algorithm can generate near-optimal solutions with less than a 1% difference as compared to CPLEX solutions. The algorithm can find a solution within 5 min for a case with a large problem size, whereas CPLEX cannot find the solution in an hour. At the same service level, the cost decreases with the initial inventory capacity and CO2 emission limit and increases with the demand and number of the types of products. The cost gap that is caused by increasing these parameters becomes larger when the service level is higher. This finding indicates that the parameters' values are important to the company when a high service level is required. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:12
相关论文
共 48 条
[1]   MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs [J].
Absi, Nabil ;
Kedad-Sidhoum, Safia .
RAIRO-OPERATIONS RESEARCH, 2007, 41 (02) :171-192
[2]   NP-hard and polynomial cases for the single-item lot sizing problem with batch ordering under capacity reservation contract [J].
Akbalik, Ayse ;
Hadj-Alouane, Atidel B. ;
Sauer, Nathalie ;
Ghribi, Houcem .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 257 (02) :483-493
[3]   Polynomial time algorithms for the constant capacitated single-item lot sizing problem with stepwise production cost [J].
Akbalik, Ayse ;
Rapine, Christophe .
OPERATIONS RESEARCH LETTERS, 2012, 40 (05) :390-397
[4]  
[Anonymous], 1990, MATH PROGRAM
[5]   Polynomial cases of the economic lot sizing problem with cost discounts [J].
Archetti, Claudia ;
Bertazzi, Luca ;
Speranza, M. Grazia .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (02) :519-527
[6]   Lot sizing in reverse MRP for scheduling disassembly [J].
Barba-Gutierrez, Y. ;
Adenso-Diaz, B. ;
Gupta, S. M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :741-751
[7]   Carbon Footprint and the Management of Supply Chains: Insights From Simple Models [J].
Benjaafar, Saif ;
Li, Yanzhi ;
Daskin, Mark .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2013, 10 (01) :99-116
[8]   Environmentally responsible inventory models: Non-classical models for a non-classical era [J].
Bonney, Maurice ;
Jaber, Mohamad Y. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 133 (01) :43-53
[9]   Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory [J].
Brahimi, Nadjib ;
Absi, Nabil ;
Dauzere-Peres, Stephane ;
Kedad-Sidhoum, Safia .
OR SPECTRUM, 2015, 37 (04) :983-1006
[10]  
Bunse K., 2010, MANAGING ENERGY EFFI, P260