Three-layer supply chain - A production-inventory model for reworkable items

被引:58
作者
Pal, Brojeswar [2 ]
Sana, Shib Sankar [1 ]
Chaudhuri, Kripasindhu [2 ]
机构
[1] Univ Calcutta, Dept Math, Kolkata 743502, India
[2] Jadavpur Univ, Dept Math, Kolkata 700032, India
关键词
Flexible manufacturing systems; Imperfect production process; Reliability; Rework; Supply chain; ECONOMIC PRODUCTION QUANTITY; OPTIMAL REPLENISHMENT POLICY; QUALITY EMQ MODEL; PRODUCTION SYSTEM; IMPERFECT QUALITY; RUN-TIME; LOT-SIZE;
D O I
10.1016/j.amc.2012.06.038
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This article develops an integrated production-inventory model considering perfect and imperfect quality items, product reliability and reworking of defective items in the environment of supply chain management. Manufacturer, supplier and retailer are the members of the supply chain where supplier delivers raw materials to the manufacturer and sends back the defective raw materials after completion of inspection at a single lot with less market price. In this system, production starts to produce good items at the beginning of the production. The production system may undergo an "out-of-control" state from an "in-control" state, after a certain time that follows a probability density function. The density function varies with reliability of the machinery system that may be controlled by new technologies, investing more capital. The defective items produced in "out-of-control" state are reworked at a cost just after the regular production time. This model considers the impact of business strategies such as optimal order size of raw materials, production rate and unit production cost, and idle times in different sectors in a collaborating marketing system. An analytical method is employed to optimize the production rate and raw material order size for maximum expected average profit. A numerical example along with four graphical illustrations is considered and its sensitivity analysis is provided to test feasibility of the model. (C) 2012 Elsevier Inc. All rights reserved.
引用
收藏
页码:530 / 543
页数:14
相关论文
共 32 条
[1]   Policies for a single-vendor multi-buyer system with finite production rate [J].
Abdul-Jalbar, Beatriz ;
Gutierrez, Jose M. ;
Sicilia, Joaquin .
DECISION SUPPORT SYSTEMS, 2008, 46 (01) :84-100
[2]   An integrated JIT inventory model [J].
Banerjee, A ;
Kim, SL .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1995, 15 (09) :237-&
[3]   Optimal batch quantity models for a lean production system with in-cycle rework and scrap [J].
Biswas, Pablo ;
Sarker, Bhaba R. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (23) :6585-6610
[4]   Economic production quantity model for items with imperfect quality (vol 64, pg 59, 2000) [J].
Cárdenas-Barrón, LE .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 67 (02) :201-201
[5]   Optimizing inventory decisions in a multi-stage multi-customer supply chain:: A note [J].
Cardenas-Barron, Leopoldo Eduardo .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2007, 43 (05) :647-654
[6]   Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging [J].
Chiu, Singa Wang .
APPLIED STOCHASTIC MODELS IN BUSINESS AND INDUSTRY, 2007, 23 (02) :165-178
[7]   Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns [J].
Chiu, Singa Wang ;
Wang, Shan-Ling ;
Chiu, Yuan-Shyi Peter .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (02) :664-676
[9]   Numerical method for determination of reworking or scraping the defective items in a finite production rate model [J].
Chiu, YSP ;
Chiu, SW ;
Chao, FC .
COMMUNICATIONS IN NUMERICAL METHODS IN ENGINEERING, 2006, 22 (05) :377-386
[10]   An optimal production run time with imperfect production processes and allowable shortages [J].
Chung, KJ ;
Hou, KL .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (04) :483-490