Decision-Making Support Method for the Preventive Substitution of Surge Arresters on Distribution Systems

被引:6
|
作者
Araujo, Marcel A. [1 ]
Spatti, Danilo H. [2 ]
Liboni, Luisa H. B. [3 ]
Pergentino, Luiz A. [4 ]
Viana, Fabricio E. [4 ]
Flauzino, Rogerio A. [5 ]
机构
[1] Fed Rural Univ Pernambuco UFRPE, Acad Units Cabo Santo Agostinho UACSA, Rod Arminio Guilherme 2635, Cabo De Santo Agostinho, PE, Brazil
[2] Univ Sao Paulo, Inst Math & Comp Sci ICMC, Av Trabalhador Sao Carlense 00, BR-13566590 Sao Carlos, SP, Brazil
[3] Fed Inst Educ Sci & Technol Sao Paulo IFSP, Dept Elect & Comp Engn CEC, R Americo Ambrosio 269, BR-14169263 Sertaozinho, SP, Brazil
[4] EDP Bandeirante, Av Presidente Castelo Branco 77, Mogi Das Cruzes, SP, Brazil
[5] Univ Sao Paulo, Sao Carlos Sch Engn, Dept Elect & Comp Engn, Av Trabalhador Sao Carlense 400, BR-13566590 Sao Carlos, SP, Brazil
关键词
Lightning; Overvoltage protection; Surge arrester; Preventive maintenance; Distribution system;
D O I
10.1007/s40313-018-00434-x
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the protection systems of power distribution networks, surge arresters are critical for protecting the grid against overvoltages caused by lightning. This equipment is subject to high voltages and currents during its operation, which degrades its expected lifetime. In general, the replacement of surge arresters is based on corrective maintenance procedures, which exposes the electrical system to failures since the protective characteristics of the arresters have already degraded. In this context, we seek to develop a new method for estimating the life span of surge arresters and a set of criteria for their preventive replacement. The method consists of assessing the correlation between fault occurrences in a distribution system with the occurrence of lightning in the concession area of a power utility company. In addition, the method assesses the correlation between the fault and lightning occurrences and data related to the degradation of such devices obtained by experimental and field tests in new surge arresters to estimate their life span and to implement a decision-making support system for their preventive substitution.
引用
收藏
页码:391 / 401
页数:11
相关论文
共 35 条
  • [31] Maintenance decision-making method for manufacturing system based on cost and arithmetic reduction of intensity model
    Fan-mao Liu
    Hai-ping Zhu
    Bo-xing Liu
    Journal of Central South University, 2013, 20 : 1559 - 1571
  • [32] A Synthetic Optimal Decision-making Method for Parallel Restoration Sectionalizing and Generator Start-up Sequence of Power Grids Considering Transmission and Distribution System Coordination
    Wang W.
    Wang X.
    Xu Y.
    Wang Y.
    Liu J.
    Du Y.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2024, 44 (03): : 859 - 871
  • [33] Joint decision-making of parallel machine scheduling restricted in job-machine release time and preventive maintenance with remaining useful life constraints
    He, Xinxin
    Wang, Zhijian
    Li, Yanfeng
    Khazhina, Svetlana
    Du, Wenhua
    Wang, Junyuan
    Wang, Wenzhao
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 222
  • [34] Decision support system for multicriteria reconfiguration of power distribution systems using CSO and efficient graph traversal and repository management techniques
    Andervazh, Mohammad-Reza
    Javadi, Shahram
    Aliabadi, Mahmood Hosseini
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2018, 28 (08):
  • [35] Convective-scale numerical weather prediction and warnings over Lake Victoria, Part II: Can model output support severe weather warning decision-making?
    Mittermaier, Marion
    Landman, Stephanie
    Csima, Gabriella
    Goodman, Steven
    METEOROLOGICAL APPLICATIONS, 2022, 29 (03)