Large-scale disassembly operations planning with parallel resources

被引:2
作者
Gokgur, Burak [1 ]
Gokce, Mahmut Ali [2 ]
Ozpeynirci, Selin [2 ]
机构
[1] Koc Univ, Grad Sch Business, Istanbul, Turkey
[2] Izmir Univ Econ, Dept Ind Engn, Izmir, Turkey
关键词
Disassembly systems; Disassembly scheduling; Mathematical programming; PRODUCT; PARTS;
D O I
10.1007/s00170-015-7216-x
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Disassembly systems obtain valuable parts from end-of-life products to remanufacture, reuse, or recycle them. This study deals with disassembly scheduling and presents a novel mixed integer programming model. Disassembly scheduling is the problem of determining quantity and schedule of items disassembled, held in inventory, sold, and disposed on capacitated resources over a planning horizon while satisfying at least a given service level. The model presented here includes a number of novelties including assignment of disassembly operations to parallel capacitated resources, consideration of costs to environment and demand for each level of items. We also present a problem testbed to be used for comparison of different algorithms and the generation mechanism. Results from a large experimental design using problem testbed are presented.
引用
收藏
页码:1195 / 1214
页数:20
相关论文
共 24 条
[1]   Lot sizing in reverse MRP for scheduling disassembly [J].
Barba-Gutierrez, Y. ;
Adenso-Diaz, B. ;
Gupta, S. M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :741-751
[2]   Appropriate human involvement in assembly and disassembly [J].
Bley, H ;
Reinhart, G ;
Seliger, G ;
Bernardi, M ;
Korne, T .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2004, 53 (02) :487-509
[3]   A Genetic Algorithm for Disassembly Scheduling with Assembly Product Structure [J].
Gao, Nan ;
Chen, Weida .
IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, :2238-2243
[4]  
Gungor A., 1999, P 25 INT C COMPUTERS, P70
[5]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[6]   Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art [J].
Ilgin, Mehmet Ali ;
Gupta, Surendra M. .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2010, 91 (03) :563-591
[7]   Disassembly sequencing for maintenance: a survey [J].
Kang, Jun-Gyu ;
Xirouchakis, P. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2006, 220 (10) :1697-1716
[8]   Disassembly scheduling: literature review and future research directions [J].
Kim, H.-J. ;
Lee, D.-H. ;
Xirouchakis, P. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (18-19) :4465-4484
[9]   A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints [J].
Kim, H. -J. ;
Lee, D. -H. ;
Xirouchakis, P. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (10) :1231-1240
[10]   A branch and bound algorithm for disassembly scheduling with assembly product structure [J].
Kim, H-J ;
Lee, D-H ;
Xirouchakis, P. ;
Kwon, O. K. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (03) :419-430