An Approach on Long Running Business Process Modelling and Simulation

被引:0
作者
Stankevicius, Kestutis [1 ]
Vasilecas, Olegas [1 ]
机构
[1] Vilnius Gediminas Tech Univ, Dept Informat Syst, Vilnius, Lithuania
来源
2016 OPEN CONFERENCE OF ELECTRICAL, ELECTRONIC AND INFORMATION SCIENCES (ESTREAM) | 2016年
关键词
long running business process; business process modelling; business process simulation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
It is mandatory for organizations to keep up with rapid and continuous changes to their business processes to be competitive. Business process simulation is a preferred way to improve these changes. Many business processes can start with partially filled data and run for a few days or even longer. Such business processes arc defined as long running business processes. However, business process simulation treat such processes the same as other processes and do not fully evaluate the real world situation. A change in the context of the long running business process can interrupt or compensate it without violating any business process constraints. Furthermore, such business process simulation should not compute redundant results. Therefore, an approach for long running business process modelling and simulation should be developed to adopt these circumstances. In this paper, we propose a novel approach that allows an active simulation to handle long running business processes and avoid redundant operation activation by using event based models. Throughout this paper, we use the word saga to define long running business processes.
引用
收藏
页数:4
相关论文
共 17 条
[1]   Automating the Simulation of SME Processes through a Discrete Event Parametric Model [J].
Aggogeri, Francesco ;
Faglia, Rodolfo ;
Mazzola, Marco ;
Merlo, Angelo .
INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 2015, 7 :1-10
[2]  
Bennett B, 2000, LECT NOTES COMPUT SC, V1795, P331
[3]  
Bruni R, 2005, LECT NOTES COMPUT SC, V3653, P383, DOI 10.1007/11539452_30
[4]  
Duckwitz S., 2011, SIMULATION HUMAN BEH
[5]   Compensation is not enough [J].
Greenfield, P ;
Fekete, A ;
Jang, JL ;
Kuo, D .
SEVENTH IEEE INTERNATIONAL ENTERPRISE DISTRIBUTED OBJECT COMPUTING CONFERENCE, PROCEEDINGS, 2003, :232-239
[6]  
Hlupic V, 1998, 1998 WINTER SIMULATION CONFERENCE PROCEEDINGS, VOLS 1 AND 2, P1363, DOI 10.1109/WSC.1998.746003
[7]   A formal framework for business process modelling and design [J].
Koubarakis, M ;
Plexousakis, D .
INFORMATION SYSTEMS, 2002, 27 (05) :299-319
[8]  
Laguna M., 2013, Business process modeling, simulation and design, P439
[9]  
Muhl G., 2006, DISTRIBUTED EVENT BA
[10]  
Padilla J., 2011, SCS Modeling Simulation Magazine, V4, P161