Tower Cranes

被引:0
作者
Petroski, Henry [1 ]
机构
[1] Duke Univ, Durham, NC 27706 USA
关键词
D O I
10.1511/2008.75.458
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Several crane accidents received unusually broad news coverage in 2010 because they reached beyond the construction site. The mechanics of a hammerhead tower crane are relatively straightforward. The vertical mast section is typically anchored in a large concrete footing, which provides a firm foundation upon which the weight of the crane and anything it might lift can bear. The amount of material that a tower crane can lift depends on how far from the tower pivot the load is located. The farther from the supporting mast, the greater the tendency of a load to overturn the crane. There are as many as 3,000 tower cranes operating in the US, making over 105,000 lifts daily without incident. Construction cranes tend to be remarkable but ignorable parts of the built environment until an incident in which something goes terribly wrong.
引用
收藏
页码:458 / 461
页数:4
相关论文
共 50 条
  • [31] Models for assessing hoisting times of tower cranes
    Leung, AWT
    Tam, CM
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (06): : 385 - 391
  • [32] Modeling and Control of Tower Cranes With Elastic Structure
    Rauscher, Florentin
    Sawodny, Oliver
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2021, 29 (01) : 64 - 79
  • [33] Rzhev Crane Plant: Prospects of tower cranes
    Kovalev, V.I.
    Stroitel'nye i Dorozhnye Mashiny, 2002, (12): : 7 - 10
  • [34] Robust integral sliding mode control of tower cranes
    Aboserre, Lobna T.
    El-Badawy, Ayman A.
    JOURNAL OF VIBRATION AND CONTROL, 2021, 27 (9-10) : 1171 - 1183
  • [35] An Elastic Jib Model for the Slewing Control of Tower Cranes
    Rauscher, Florentin
    Sawodny, Oliver
    IFAC PAPERSONLINE, 2017, 50 (01): : 9796 - 9801
  • [36] Group Tower Cranes Anti-collision Algorithm
    Chen, Guangzhong
    Zhang, Bing
    Yang, Yue
    ADVANCES IN MECHATRONICS AND CONTROL ENGINEERING, PTS 1-3, 2013, 278-280 : 1700 - +
  • [37] Nonlinear models for predicting hoisting times of tower cranes
    Tam, CM
    Leung, AWT
    Liu, DK
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (01) : 76 - 81
  • [38] Automatic optimal design algorithm for the foundation of tower cranes
    Kim, Sun-Kuk
    Kim, Jang-Young
    Lee, Dong-Hoon
    Ryu, Sang-Yeon
    AUTOMATION IN CONSTRUCTION, 2011, 20 (01) : 56 - 65
  • [39] Tower cranes supply for construction in zone of cold climate
    Nevzorov, L.A.
    Stroitel'nye i Dorozhnye Mashiny, 1993, (01):
  • [40] Application of the permanent magnet synchronous motors for tower cranes
    Knypinski, Lukasz
    Krupinski, Jacek
    PRZEGLAD ELEKTROTECHNICZNY, 2020, 96 (01): : 27 - 30