Optimal periodic preventive maintenance policy for a system subject to failures/repairs which follow the non-homogeneous pure birth process

被引:13
|
作者
Chien, Yu-Hung [1 ]
Zhang, Zhe George [2 ,3 ]
Su, Siping [2 ]
Sheu, Shey-Huei [4 ,5 ,6 ]
机构
[1] Natl Taichung Univ Sci & Technol, Dept Appl Stat, Taichung, Taiwan
[2] Western Washington Univ, Dept Decis Sci, Bellingham, WA 98225 USA
[3] Simon Fraser Univ, Beedie Sch Business, Burnaby, BC, Canada
[4] Asia Univ, Dept Business Adm, Taichung, Taiwan
[5] China Med Univ, China Med Univ Hosp, Dept Med Res, Taichung, Taiwan
[6] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
来源
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT | 2021年 / 18卷 / 03期
关键词
Non-Homogeneous Pure Birth Process; preventive maintenance; worse-than-minimal-repair; long-run expected cost rate; optimal PM schedule; GENERALIZED POLYA PROCESS; BLOCK REPLACEMENT POLICY; MODELS;
D O I
10.1080/16843703.2020.1796208
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers a periodic preventive maintenance policy for a deteriorating and repairable system. The system is subject to random failures and is repaired at each failure. To improve the reliability, at periodic timesiT(i= 1, 2, horizontal ellipsis N-1), the system is preventively maintained (PM). At the timeNTthe system is replaced. The failure/repair process between two PMs follows the Non-Homogeneous Pure Birth Process (NHPBP) which is a generalized version of the Non-homogeneous Poisson process (NHPP). The reliability improvement made by a PM action is stochastically modeled based on the properties of NHPBP. The cost for each PM depends on the reliability condition of the system at that PM time. The PM policy is characterized by the two parameters (N, T). We develop a two-stage procedure to find the optimal (N*, T*) which minimizes the long-run expected cost rate. Numerical examples are presented to illustrate the properties of the optimal policies.
引用
收藏
页码:285 / 297
页数:13
相关论文
共 9 条
  • [1] Optimal Number of Repairs Before Replacement for a System Subject to Shocks of a Non-Homogeneous Pure Birth Process
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Chang, Chin-Chih
    Zhang, Zhe George
    IEEE TRANSACTIONS ON RELIABILITY, 2013, 62 (01) : 73 - 81
  • [2] A note on replacement policy for a system subject to non-homogeneous pure birth shocks
    Sheu, Shey-Huei
    Chang, Chin-Chih
    Zhang, Zhe George
    Chien, Yu-Hung
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 216 (02) : 503 - 508
  • [3] Non-periodic inspection and replacement policy of system subject to non-homogeneous gamma degradation process
    Yao, Fengming
    Hu, Jiawen
    Li, Bo
    Liu, Hengchang
    Gong, Feng
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2024, 40 (03) : 1165 - 1181
  • [4] A note on a two variable block replacement policy for a system subject to non-homogeneous pure birth shocks
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Chang, Chin-Chih
    Zhang, Zhe George
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (5-6) : 3703 - 3712
  • [5] Condition-based maintenance for a system subject to a non-homogeneous wear process with a wear rate transition
    Fouladirad, Mitra
    Grall, Antoine
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (06) : 611 - 618
  • [7] An optimal preventive maintenance policy for a two-stage competing-risk system with hidden failures
    Zhang, Yanjing
    Shen, Jingyuan
    Ma, Yizhong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 154
  • [8] Optimal inspection and preventive maintenance policy for systems with self-announcing and non-self-announcing failures
    Chelbi, Anis
    Ait-Kadi, Daoud
    Aloui, Houda
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2008, 14 (01) : 34 - +
  • [9] Quasi-periodic Inspection and Preventive Maintenance Policy Optimisation for a system with Wiener Process degradation
    Gao, Wenke
    Wang, Yu
    Zhang, Xiwen
    Wang, Zhuangzhuang
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2023, 25 (02):