Project scheduling using a competitive genetic algorithm

被引:0
作者
Magalhaes-Mendes, J. [1 ]
机构
[1] Polytechn Porto, Sch Engn, Dept Civil Engn, Rua Dr Antonio Bernardino Almeida 431, P-4200072 Oporto, Portugal
来源
SMO 08: PROCEEDINGS OF THE 8TH WSEAS INTERNATIONAL CONFERENCE ON SIMULATION, MODELLING AND OPTIMIZATION | 2008年
关键词
Project management; scheduling; genetic algorithm; optimization; RCPSP;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have-been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
引用
收藏
页码:39 / +
页数:2
相关论文
共 16 条
[1]  
[Anonymous], 2003, P 3 INT WORKSH COMP
[2]  
[Anonymous], 2003, HYBRID GENETIC ALGOR
[3]  
BEASLEY D, 1993, U COMPUT, V15, P58
[4]   A hybrid scatter search/electromagnetism meta-heuristic for project scheduling [J].
Debels, D ;
De Reyck, B ;
Leus, R ;
Vanhoucke, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (02) :638-653
[5]   Solving the resource-constrained project problem by a variable neighbourhood scheduling search [J].
Fleszar, K ;
Hindi, KS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 155 (02) :402-413
[6]  
Goldberg D.E, 1989, GENETIC ALGORITHMS S
[7]   A hybrid genetic algorithm for the job shop scheduling problem [J].
Gonçalves, JF ;
Mendes, JJDM ;
Resende, MGC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) :77-95
[8]   Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects [J].
Klein, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 127 (03) :619-638
[9]   Experimental investigation of heuristics for resource-constrained project scheduling: An update [J].
Kolisch, Rainer ;
Hartmann, Soenke .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 174 (01) :23-37
[10]   A random key based genetic algorithm for the resource constrained project scheduling problem [J].
Mendes, J. J. M. ;
Goncalves, J. F. ;
Resende, M. G. C. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (01) :92-109