Partial Elastic Scheme Method in Cantilever Construction of Concrete Arch Bridges

被引:44
作者
Granata, Michele Fabio [1 ]
Margiotta, Piercarlo [2 ]
Recupero, Antonino [3 ]
Arici, Marcello [1 ]
机构
[1] Univ Palermo, Dipartimento Ingn Civile Ambientale Aerosp & Mat, I-90128 Palermo, Italy
[2] Univ Palermo, DICAM, I-90128 Palermo, Italy
[3] Univ Messina, DIC, I-98166 Messina, Italy
关键词
Arch bridged; Concrete bridges; Elasticity; Cantilevers; Construction; Arch bridge; Partial elastic scheme; Cantilever construction; Stays; Forward analysis; CABLE-STAYED BRIDGES; OPTIMIZATION;
D O I
10.1061/(ASCE)BE.1943-5592.0000396
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, a study about stay stressing procedures of concrete arch bridges built by cantilevering with temporary stays is presented. Particularly, the partial elastic scheme method is proposed to find the initial cable forces, and a forward procedure is implemented to follow the actual sequence of construction by extending a procedure already applied to concrete cable-stayed bridges. The theoretical treatment is followed by a numerical application on a case study of a concrete arch bridge, and a comparison between initial cable forces found by the partial elastic scheme method and classical backward analysis is presented here. Results show the effectiveness of the proposed procedure to achieve the requested design geometry of the arch and for limiting the variation of bending moments and stay forces in construction stages.
引用
收藏
页码:663 / 672
页数:10
相关论文
共 30 条
[1]  
American Concrete Institute (ACI), 2008, ACI 209.2R
[2]  
[Anonymous], 1998, 209R92 ACI, P209
[3]   The influence of time-dependent phenomena in segmental construction of concrete cable-stayed bridges [J].
Arici, M. ;
Granata, M. F. ;
Recupero, A. .
BRIDGE STRUCTURES, 2011, 7 (04) :125-137
[4]   RECIPROCAL CONJUGATE METHOD FOR SPACE CURVED BARS [J].
ARICI, M .
JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1989, 115 (03) :560-575
[5]   Construction Control of Reinforced Concrete Arch Bridges [J].
Au, F. T. K. ;
Wang, J. J. ;
Liu, G. D. .
JOURNAL OF BRIDGE ENGINEERING, 2003, 8 (01) :39-45
[6]  
Baant Z. P., 2000, P A NEV S CREEP SHRI, P1
[7]  
Brenni L., 1987, IND ITALIANA CEMENTO, VLVII, P310
[8]  
CEB, 1993, B INF B INF
[9]   Determination of initial cable forces in prestressed concrete cable-stayed bridges for given design deck profiles using the force equilibrium method [J].
Chen, DW ;
Au, FTK ;
Tham, LG ;
Lee, PKK .
COMPUTERS & STRUCTURES, 2000, 74 (01) :1-9
[10]  
da Fonseca A.Adao., 2005, Structural Engineering International, V15, P85