An ANP-based approach for the selection of photovoltaic solar power plant investment projects

被引:119
作者
Aragones-Beltran, P. [1 ]
Chaparro-Gonzalez, F. [2 ]
Pastor-Ferrando, J. P. [1 ]
Rodriguez-Pozo, F. [1 ]
机构
[1] Univ Politecn Valencia, Dept Engn Projects, Valencia 46022, Spain
[2] Univ Politecn Valencia, Dept Business, Valencia 46022, Spain
关键词
Multicriteria decision analysis; Analytic Network Process; Photovoltaic solar power projects; ANALYTIC NETWORK PROCESS; ALTERNATIVE FUELS; PROCESS MODEL; FACILITIES; LOGISTICS; EXAMPLE; PV;
D O I
10.1016/j.rser.2009.07.012
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network(groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:249 / 264
页数:16
相关论文
共 36 条
  • [1] Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach
    Agarwal, Ashish
    Shankar, Ravi
    Tiwari, M. K.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (01) : 211 - 225
  • [2] [Anonymous], 2008, RENEW SUST ENERG REV, DOI DOI 10.1016/J.RSER.2007.06.011
  • [3] [Anonymous], 1994, AHP SERIES
  • [4] ARAGONESBELTRAN P, 2008, EUR J OPER RES, V322, P185
  • [5] An analytic network process-based approach to concept evaluation in a new product development environment
    Ayag, Z.
    Ozdemir, R. G.
    [J]. JOURNAL OF ENGINEERING DESIGN, 2007, 18 (03) : 209 - 226
  • [6] Comparative analysis of different supporting measures for the production of electrical energy by solar PV and Wind systems: Four representative European cases
    Campoccia, A.
    Dusonchet, L.
    Telaretti, E.
    Zizzo, G.
    [J]. SOLAR ENERGY, 2009, 83 (03) : 287 - 297
  • [7] Grid-connected PV buildings: analysis of future scenarios with an example of Southern Spain
    Castro, M
    Delgado, A
    Argul, FJ
    Colmenar, A
    Yeves, F
    Peire, J
    [J]. SOLAR ENERGY, 2005, 79 (01) : 86 - 95
  • [8] Cheng EddieW. L., 2004, CONSTRUCTION MANAGEM, V22, P1021, DOI DOI 10.1080/0144619042000202852
  • [9] Analytic network process applied to project selection
    Cheng, EWL
    Li, H
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) : 459 - 466
  • [10] Analytic network process (ANP) approach for product mix planning in semiconductor fabricator
    Chung, SH
    Lee, AHI
    Pearn, WL
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (01) : 15 - 36