Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling

被引:76
作者
Janak, Stacy L.
Floudas, Christodoulos A. [1 ]
Kallrath, Josef
Vormbrock, Norbert
机构
[1] Princeton Univ, Dept Chem Engn, Princeton, NJ 08544 USA
[2] BASF AG, GVCS, D-67056 Ludwigshafen, Germany
[3] BASF IT Serv GmbH, SCPE Q920, D-67056 Ludwigshafen, Germany
关键词
D O I
10.1021/ie0600588
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The medium-term production scheduling of a multipurpose, multiproduct industrial batch plant is modeled using a novel mathematical framework. The methodology consists of the decomposition of the whole scheduling period into successive short horizons of a few days. A decomposition model is implemented to determine each short horizon and the corresponding products to be included. Then, a novel continuous-time formulation for short-term scheduling of batch processes with multiple intermediate due dates is applied to each short horizon selected, leading to a large-scale mixed-integer linear programming (MILP) problem. The scheduling model includes over 80 pieces of equipment and can take into account the processing recipes of hundreds of different products. Several characteristics of the production plant are incorporated into the scheduling model and actual plant data are used to model all parameters. Two different modes of operation are presented along with representative production schedules to demonstrate the effectiveness of the proposed formulation.
引用
收藏
页码:8234 / 8252
页数:19
相关论文
共 52 条
[1]   An MILP Continuous-Time Framework for Short-Term Scheduling of Multipurpose Batch Processes Under Different Operation Strategies [J].
Alberto Mendez, Carlos ;
Cerda, Jaime .
OPTIMIZATION AND ENGINEERING, 2003, 4 (1-2) :7-22
[2]   Decomposition techniques for the solution of large-scale scheduling problems [J].
Bassett, MH ;
Pekny, JF ;
Reklaitis, GV .
AICHE JOURNAL, 1996, 42 (12) :3373-3387
[3]  
BROOKE A, 2003, GAMS USERS GUIDE
[4]   An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants [J].
Castro, P ;
Barbosa-Póvoa, APFD ;
Matos, H .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (09) :2059-2068
[5]   Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations:: A case study approach [J].
Castro, PM ;
Barbosa-Póvoa, AP ;
Matos, HA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (14) :3346-3360
[6]   A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines [J].
Cerda, J ;
Henning, GP ;
Grossmann, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1997, 36 (05) :1695-1707
[7]  
*CPLEX, 2005, ILOG CPLEX 9 0 US MA
[8]  
Dimitriadis AD, 1997, COMPUT CHEM ENG, V21, pS1061
[9]   A decomposition heuristic for scheduling the general batch chemical plant [J].
Elkamel, A ;
Zentner, M ;
Pekny, JF ;
Reklaitis, GV .
ENGINEERING OPTIMIZATION, 1997, 28 (04) :299-330
[10]  
Floudas C.A., 1995, NONLINEAR MIXED INTE