Owner's Risks versus Control in Transit Projects

被引:15
作者
Ghavamifar, Kamran [1 ]
Touran, Ali [1 ]
机构
[1] Northeastern Univ, Dept Civil & Environm Engn, Boston, MA 02090 USA
关键词
Contracts; Owners; Project delivery; Risk management;
D O I
10.1061/(ASCE)0742-597X(2009)25:4(230)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies the characteristics of different project delivery methods in public transit projects with respect to the owner's project control and its share in project risks. The most appropriate project delivery method is selected early in the project life cycle based on a number of objectives and criteria set forth by the owner. The ability to manage risk effectively and owner's control over the project are among the most important factors for selecting the delivery method. These two factors are highly interrelated. This paper discusses the interaction of risk and control in the context of the project delivery method. Results of several interviews with transit authorities are used to ensure the validity of findings. This paper shows that higher control over the project is achieved only if the owner is willing to accept more risks. In other words, there is no delivery method that allows the owner to enjoy high levels of control and minimum risk simultaneously.
引用
收藏
页码:230 / 233
页数:4
相关论文
共 11 条
  • [1] CHOOSING APPROPRIATE CONSTRUCTION CONTRACTING METHOD
    GORDON, CM
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (01): : 196 - 210
  • [2] KESSLER F, 2005, MANAGING YOUR MONEY
  • [3] Mahdi I. M., 2005, International Journal of Project Management, V23, P564, DOI 10.1016/j.ijproman.2005.05.007
  • [4] Minchin E., 2007, Innovative project delivery systems, P46
  • [5] MITCHELL BP, 1999, APPL SPEARIN DOCTRIN
  • [6] Relative effectiveness of project delivery and contract strategies
    Oyetunji, AA
    Anderson, SD
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (01): : 3 - 13
  • [7] Risky business
    Rubin, RA
    Wordes, D
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (06) : 36 - 43
  • [8] *TCRP, 2002, DES BUILD TRANS INFR
  • [9] TOMEH O, 1999, TRANSPORT RES REC, V1677, P79
  • [10] Walewski J., 2001, PROJECT DELIVERY MET