Probabilistic Evaluation of the Stability in Earned Value Management Forecasting on Topologically Diverse Project Networks

被引:1
|
作者
Ladeeda, V. H. [1 ]
Jeevan, Jacob [1 ]
机构
[1] Mar Athanasius Coll Engn, Dept Civil Engn, Kothamangalam, Kerala, India
关键词
Earned value management; Cost performance index; Schedule performance indices; Network topology; Stability simulation model; Stability analysis;
D O I
10.1007/978-3-030-26365-2_66
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
"When will the project performance indices in my project become stable?" is an ever interesting fundamental question in earned value management (EVM) but mostly unresolved as well, especially for the highly dynamic construction projects which call for frequent updating and rescheduling. The stability of the performance indices assures the credibility of EVM as an effective tool to analyse the project performances as well as to forecast the requirements. This paper presents an assessment of time and cost performance stability in EVM based on an analytical stability simulation model which evaluates the probability of the stable project performance indices during the project execution for topologically diverse construction project networks. The model is used to identify the effects of percentage completion, network topology as well as its compounding effects on the stability of EVM forecasting and topology-stability relations were developed for schedule performances. Finally, the performance indices are compared for the stability behaviour.
引用
收藏
页码:713 / 724
页数:12
相关论文
共 50 条
  • [21] Combination of Project Cost Forecasts in Earned Value Management
    Kim, Byung-Cheol
    Reinschmidt, Kenneth F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11): : 958 - 966
  • [22] Hybrid Artificial Neural Network and Statistical Model for Forecasting Project Total Duration in Earned Value Management
    Li, You
    Liu, Lu
    NINTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2010, : 2603 - 2609
  • [23] Hybrid artificial neural network and statistical model for forecasting project total duration in earned value management
    Li, Y. (lijinbi-sony@163.com), 1600, Inderscience Publishers (10): : 3 - 4
  • [24] Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting
    Batselier, Jordy
    Vanhoucke, Mario
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (01) : 28 - 43
  • [25] Earned value project management: Improving the predictive power of planned value
    Chen, Hong Long
    Chen, Wei Tong
    Lin, Ying Lien
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (01) : 22 - 29
  • [26] Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities
    de Andrade, Paulo Andre
    Martens, Annelies
    Vanhoucke, Mario
    AUTOMATION IN CONSTRUCTION, 2019, 99 : 68 - 78
  • [27] The Application of Improved Earned Value Management Method in Engineering Project Management
    Gao Xiuju
    MOT2009: PROCEEDINGS OF ZHENGZHOU CONFERENCE ON MANAGEMENT OF TECHNOLOGY, VOLS I AND II, 2009, : 383 - 387
  • [28] Using earned-value analysis for better project management
    Hayes, HB
    Miller, J
    BIOPHARM-THE APPLIED TECHNOLOGIES OF BIOPHARMACEUTICAL DEVELOPMENT, 2002, 15 (03): : 58 - 59
  • [29] Improving Forecasting Accuracy of Project Earned Value Metrics: Linear Modeling Approach
    Chen, Hong Long
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 135 - 145
  • [30] Application of improved earned value method in project management processes
    Qiao, Li-Hong
    Guo, Guang-Xin
    Yang, Zhi-Bing
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2010, 30 (01): : 33 - 36