Probabilistic Evaluation of the Stability in Earned Value Management Forecasting on Topologically Diverse Project Networks

被引:1
|
作者
Ladeeda, V. H. [1 ]
Jeevan, Jacob [1 ]
机构
[1] Mar Athanasius Coll Engn, Dept Civil Engn, Kothamangalam, Kerala, India
关键词
Earned value management; Cost performance index; Schedule performance indices; Network topology; Stability simulation model; Stability analysis;
D O I
10.1007/978-3-030-26365-2_66
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
"When will the project performance indices in my project become stable?" is an ever interesting fundamental question in earned value management (EVM) but mostly unresolved as well, especially for the highly dynamic construction projects which call for frequent updating and rescheduling. The stability of the performance indices assures the credibility of EVM as an effective tool to analyse the project performances as well as to forecast the requirements. This paper presents an assessment of time and cost performance stability in EVM based on an analytical stability simulation model which evaluates the probability of the stable project performance indices during the project execution for topologically diverse construction project networks. The model is used to identify the effects of percentage completion, network topology as well as its compounding effects on the stability of EVM forecasting and topology-stability relations were developed for schedule performances. Finally, the performance indices are compared for the stability behaviour.
引用
收藏
页码:713 / 724
页数:12
相关论文
共 50 条
  • [1] Probabilistic Evaluation of Cost Performance Stability in Earned Value Management
    Kim, Byung-Cheol
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [2] Stability and accuracy of deterministic project duration forecasting methods in earned value management
    Barrientos-Orellana, Alexis
    Ballesteros-Perez, Pablo
    Mora-Melia, Daniel
    Gonzalez-Cruz, Maria Carmen
    Vanhoucke, Mario
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (03) : 1449 - 1469
  • [3] Study of the Stability of Earned Value Management Forecasting
    Wauters, Mathieu
    Vanhoucke, Mario
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (04)
  • [4] Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method
    Kim, Byung-Cheol
    Reinschmidt, Kenneth F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (08) : 834 - 843
  • [5] Project cost forecasting based on earned value management and Markov chain
    Damavandi, Majid
    Tavakoli, Mahdieh
    Jolai, Fariborz
    ANNALS OF OPERATIONS RESEARCH, 2024,
  • [6] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15
  • [7] Project management: Earned value management
    Duncan, B
    TECHNOLOGY OF OBJECT-ORIENTED LANGUAGES AND SYSTEMS - TOOLS 34, PROCEEDINGS, 2000, : 513 - 514
  • [8] Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management
    Batselier, Jordy
    Vanhoucke, Mario
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) : 1588 - 1596
  • [9] Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
    Huang, Jianwen
    Pan, Huimin
    Li, Yan
    Zhu, Yiting
    Liao, Zaiyi
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1437 - +
  • [10] The Application of Earned Value in Project Management
    Lv, Xiuling
    Wu, Jiangfeng
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2844 - 2847