Inexact quadratic joint-probabilistic programming for water quality management under uncertainty in the Xiangxi River, China

被引:19
作者
Hu, Ming [1 ]
Huang, Guo H. [1 ]
Sun, Wei [2 ]
Li, Yongping P. [1 ]
机构
[1] North China Elect Power Univ, MOE Key Lab Reg Energy Syst Optimizat, S&C Acad Resources & Environm Res, Beijing 102206, Peoples R China
[2] Univ Regina, Fac Engn & Appl Sci, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
关键词
Inexact quadratic programming; Joint probability programming; Water quality management; Uncertainty; RESOURCES MANAGEMENT; FUZZY OPTIMIZATION; MODEL; RESERVOIR; SYSTEMS;
D O I
10.1007/s00477-012-0648-z
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An inexact quadratic joint-probabilistic programming model for water quality management (IQJWQ) is developed and applied to supporting multiple-point-source waste reduction in the Xiangxi River, China. The IQJWQ is a hybrid of interval quadratic programming, joint probabilistic programming and multi-segment water quality simulation. It has advantages in reflecting uncertainties expressed as joint probabilities of system risk, probability distributions of water quality standards, interval parameters and nonlinearities in the objective function. An interactive and derivative algorithm is employed for solving the IQJWQ model. The results indicate that the Pingyikou chemical plant and Liucaopo chemical plant contribute more to pollution of the main stream in the Xiangxi River, which should be the prior plants to reduce the wastewater discharge and enhance the wastewater treatment efficiencies. Meanwhile, the environmental agencies should choose the joint probability carefully to balance the tradeoff between production development and pollution control. Compared with the conventional chance-constrained programming method, the IQJWQ exhibits an increased robustness in handling the overall system risk in the optimization process. Although this study is the first application of the IQJWQ to water quality management, the proposed methods in the IQJWQ can also be applicable to many other environmental management problems under uncertainty.
引用
收藏
页码:1115 / 1132
页数:18
相关论文
共 67 条
[1]  
[Anonymous], STOCH ENV RES RISK A
[2]  
[Anonymous], ENV SYSTEMS OPTIMIZA
[3]   Field Measurements and Flow Modeling of Overbank Flows in River Severn, UK [J].
Babaeyan-Koopaei, K. ;
Ervine, D. A. ;
Pender, G. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2003, 1 (01) :28-36
[4]   Application of First-Order and Monte Carlo Analysis in Watershed Water Quality Models [J].
Bobba, A. Ghosh ;
Singh, Vijay P. ;
Bengtsson, Lars .
WATER RESOURCES MANAGEMENT, 1996, 10 (03) :219-240
[5]  
Bouwer H, 2003, J FOOD AGRIC ENVIRON, V1, P118
[6]   An inexact programming approach for supporting ecologically sustainable water supply with the consideration of uncertain water demand by ecosystems [J].
Cai, Y. P. ;
Huang, G. H. ;
Wang, X. ;
Li, G. C. ;
Tan, Q. .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2011, 25 (05) :721-735
[7]   Climate Change and Pesticide Loss in Watershed Systems: A Simulation Modeling Study [J].
Chen, B. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2007, 10 (02) :55-67
[8]   A derivative algorithm for inexact quadratic program - application to environmental decision-making under uncertainty [J].
Chen, MJ ;
Huang, GH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 128 (03) :570-586
[9]   Clustering and forecasting of dissolved oxygen concentration on a river basin [J].
Costa, Marco ;
Goncalves, A. Manuela .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2011, 25 (02) :151-163
[10]  
Eckenfelder W., 2000, IND WATER POLLUTION