Multi-satellite control system architecture and mission scheduling optimization

被引:0
作者
Jung-Hyun, Lee [1 ]
Ko, Kwang Hee [1 ]
Ahn, Hyo Sung [1 ]
Wang, Se Myung [1 ]
Choi, Sujin [2 ]
Jung, Okchul [2 ]
Chung, Daewon [2 ]
机构
[1] GIST, Bukgu, Gwangju, South Korea
[2] KARI, Daejeon 305333, South Korea
来源
2012 IEEE AEROSPACE CONFERENCE | 2012年
关键词
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
In this paper we propose an architecture for multi-satellite control systems and an optimization procedure for mission operations. The proposed multi-satellite control system architecture is obtained by structuring existing mission control systems into three organically connected components. : (1) the ground station responsible for the mechanical parts, (2) the users responsible for the overall management, and (3) the mission control element responsible for the overall scheduling and software operation. In addition, we present a mission scheduling optimization procedure involving numerous satellites and ground stations. The algorithm assumes the scheduling period time, the value and allocation time of the guidance parameter file for attitude control, and the mission value and image downlink allocation time. The visibility time between a ground station and satellites is calculated by simulation using the satellite tool kit. Hence, the scheduling problems can be treated as knapsack problems where the visibility time is analogous to the knapsack and the missions are considered to be the items. To solve the multi-mission scheduling problem, we applied the dynamic programming and greedy algorithms. We compared and analyzed the two algorithms.
引用
收藏
页数:13
相关论文
共 7 条
  • [1] Choi S. J., 2009, KSAS, V15, P904
  • [2] Cormen TH, 1999, INTRO ALGORITHMS
  • [3] Jung Won-chan, KOREA SOC SPACE TECH, V1, P76
  • [4] Kim Hae-Dong, 2003, FALL C KOR SOC AER S, P707
  • [5] Lee Byoung-sun, 2003, SPRING C KOR SOC AER, P707
  • [6] Multiple agent-based autonomy for satellite constellations
    Schetter, T
    Campbell, M
    Surka, D
    [J]. ARTIFICIAL INTELLIGENCE, 2003, 145 (1-2) : 147 - 180
  • [7] Soma P., MULTISATELLITE SCHED