Environmentally conscious hoist scheduling for electroplating facilities

被引:20
作者
Kuntay, I [1 ]
Xu, Q [1 ]
Uygun, K [1 ]
Huang, YL [1 ]
机构
[1] Wayne State Univ, Dept Chem Engn & Mat Sci, Detroit, MI 48202 USA
基金
美国国家科学基金会;
关键词
electroplating; hoist scheduling; pollution prevention;
D O I
10.1080/009864490949125
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Hoist scheduling in electroplating operations has long been considered a key factor for improving the production rate. It has recently been recognized that hoist scheduling can also play an important role in waste minimization. In this work, a new hoist scheduling method is introduced for simultaneously achieving both the economic and environmental goals. A two-step dynamic optimization algorithm is introduced for identifying an optimal hoist schedule that can minimize the quantity and toxicity of wastewater streams from an electroplating line without loss of production rate. To improve computational efficiency, an engineering approach is adopted to reduce the number of binary decision variables in the optimization problem. An application to an actual electroplating process shows a significant reduction of both chemical and water consumption, which equates to a simultaneous realization of wastewater reduction and increase of profits.
引用
收藏
页码:273 / 292
页数:20
相关论文
共 41 条
[21]   A new constraint programming model and solving for the cyclic hoist scheduling problem [J].
Wallace, Mark ;
Yorke-Smith, Neil .
CONSTRAINTS, 2020, 25 (3-4) :319-337
[22]   Multiple-part cyclic hoist scheduling using a sieve method [J].
Kats, V ;
Levner, E ;
Meyzin, L .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1999, 15 (04) :704-713
[23]   Single Hoist Scheduling in No-Wait Flexible Flow Shop System [J].
Wang Shilong ;
Yao Wei ;
Zhou Jie .
ISIP: 2009 INTERNATIONAL SYMPOSIUM ON INFORMATION PROCESSING, PROCEEDINGS, 2009, :381-386
[24]   A new constraint programming model and solving for the cyclic hoist scheduling problem [J].
Mark Wallace ;
Neil Yorke-Smith .
Constraints, 2020, 25 :319-337
[25]   Simultaneous mixed-integer dynamic optimization for environmentally benign electroplating [J].
Liu, Chaowei ;
Fu, Jie ;
Xu, Qiang .
COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (11) :2411-2425
[26]   A linear optimization approach to the heterogeneous r-cyclic hoist scheduling problem [J].
El Amraoui, Adnen ;
Manier, Marie-Ange ;
El Moudni, Abdellah ;
Benrejeb, Mohamed .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (03) :360-369
[27]   An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times [J].
Leung, Janny M. Y. ;
Levner, Eugene .
OPERATIONS RESEARCH LETTERS, 2006, 34 (04) :465-472
[28]   Sustainability metrics and technical solution derivation for performance improvement of electroplating facilities [J].
Siddiqui, Abdurrafay ;
Potoff, Rebecca ;
Huang, Yinlun .
CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2024, 26 (06) :1825-1842
[29]   Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance [J].
Yan, Pengyu ;
Wang, Guanhua ;
Che, Ada ;
Li, Yaoyiran .
COMPUTERS & OPERATIONS RESEARCH, 2016, 76 :155-166
[30]   A constraint propagation heuristic for the single-hoist, multiple-products scheduling problem [J].
Hindi, KS ;
Fleszar, K .
COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 47 (01) :91-101