Environmentally conscious hoist scheduling for electroplating facilities

被引:20
|
作者
Kuntay, I [1 ]
Xu, Q [1 ]
Uygun, K [1 ]
Huang, YL [1 ]
机构
[1] Wayne State Univ, Dept Chem Engn & Mat Sci, Detroit, MI 48202 USA
基金
美国国家科学基金会;
关键词
electroplating; hoist scheduling; pollution prevention;
D O I
10.1080/009864490949125
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Hoist scheduling in electroplating operations has long been considered a key factor for improving the production rate. It has recently been recognized that hoist scheduling can also play an important role in waste minimization. In this work, a new hoist scheduling method is introduced for simultaneously achieving both the economic and environmental goals. A two-step dynamic optimization algorithm is introduced for identifying an optimal hoist schedule that can minimize the quantity and toxicity of wastewater streams from an electroplating line without loss of production rate. To improve computational efficiency, an engineering approach is adopted to reduce the number of binary decision variables in the optimization problem. An application to an actual electroplating process shows a significant reduction of both chemical and water consumption, which equates to a simultaneous realization of wastewater reduction and increase of profits.
引用
收藏
页码:273 / 292
页数:20
相关论文
共 41 条
  • [1] Electroplating production scheduling by cyclogram unfolding in dynamic hoist scheduling problem
    Kujawski, K.
    Swiatek, J.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (17) : 5355 - 5371
  • [2] Cyclic hoist scheduling in large real-life electroplating lines
    Ada Che
    Chengbin Chu
    OR Spectrum, 2007, 29 : 445 - 470
  • [3] Cyclic hoist scheduling in large real-life electroplating lines
    Che, Ada
    Chu, Chengbin
    OR SPECTRUM, 2007, 29 (03) : 445 - 470
  • [4] A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
    Che, A
    Chu, CB
    OPERATIONS RESEARCH LETTERS, 2005, 33 (03) : 274 - 284
  • [5] A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line
    Lim, JM
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 789 - 792
  • [6] Optimal cyclic scheduling of a material handling hoist in an automated PCB electroplating line (ID: 3-078)
    Che Ada
    Chu Chengbin
    Yan Pengyu
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 1369 - 1373
  • [7] Coupled optimization of task sequence and hoist scheduling for electroplating production lines based on an improved salp swarm algorithm
    Chen, Xiaoxue
    Yang, Bo
    Pang, Zhi
    Zhou, Peng
    Fu, Guang
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2024, 53 : 34 - 47
  • [8] Intelligent Scenario Selection in Dynamic Hoist Scheduling Problem: The Real-Life Electroplating Production Line Case Analysis
    Kujawski, K.
    Swiatek, J.
    WORLD CONGRESS ON ENGINEERING, WCE 2010, VOL III, 2010, : 2050 - 2056
  • [9] Paradigms for environmentally conscious manufacturing
    Edinbarough, IA
    Wells, WE
    ENVIRONMENTALLY CONSCIOUS MANUFACTURING IV, 2004, 5583 : 286 - 290
  • [10] Cyclic scheduling of a hoist with time window constraints
    Chen, HX
    Chu, CB
    Proth, JM
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (01): : 144 - 152