Integrated scheduling of crane handling and truck transportation in a maritime container terminal

被引:147
作者
Chen, Lu [1 ]
Langevin, Andre [2 ,3 ]
Lu, Zhiqiang [4 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
[2] Ecole Polytech, Dept Math & Genie Ind, Montreal, PQ H3C 3A7, Canada
[3] CIRRELT, Montreal, PQ H3C 3A7, Canada
[4] Tongji Univ, Sch Mech Engn, Shanghai 201804, Peoples R China
基金
加拿大自然科学与工程研究理事会; 中国国家自然科学基金;
关键词
Scheduling; Container terminal; Container handling; Constraint programming; Disjunctive graph; MANUFACTURING ACTIVITIES; OPERATIONS-RESEARCH; ROUTING ALGORITHM; MACHINES; SYSTEMS; TIME; TRANSSHIPMENT; OPTIMIZATION; DEPLOYMENT;
D O I
10.1016/j.ejor.2012.09.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies the interactions between crane handling and truck transportation in a maritime container terminal by addressing them simultaneously. Yard trucks are shared among different ships, which helps to reduce empty truck trips in the terminal area. The problem is formulated as a constraint programming model and a three-stage algorithm is developed. At the first stage, crane schedules are generated by a heuristic method. At the second stage, the multiple-truck routing problem is solved based on the precedence relations of the transportation tasks derived from the first stage. At the last stage a complete solution is constructed by using a disjunctive graph. The three procedures are linked by an iterative structure, which facilitates the search for a good solution. The computational results indicate that the three-stage algorithm is effective for finding high-quality solutions and can efficiently solve large problems. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:142 / 152
页数:11
相关论文
共 40 条
[1]  
Abdelmaguid TF, 2004, INT J PROD RES, V42, P267, DOI [10.1080/0020754032000123579, 10.1080/0020754031000123579]
[2]   Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies [J].
Anwar, MF ;
Nagi, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (03) :653-681
[3]   A survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) :615-627
[4]   A time window approach to simultaneous scheduling of machines and material handling system in an FMS [J].
Bilge, U ;
Ulusoy, G .
OPERATIONS RESEARCH, 1995, 43 (06) :1058-1070
[5]   A multiple-crane-constrained scheduling problem in a container terminal [J].
Bish, EK .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 144 (01) :83-107
[6]  
BOSE J, 2000, P 33 HAW INT C SYST
[7]   The integrated yard truck and yard crane scheduling problem: Blenders' decomposition-based methods [J].
Cao, Jin Xin ;
Lee, Der-Horng ;
Chen, Jiang Hang ;
Shi, Qixin .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (03) :344-353
[8]  
Cao Jinxin, 2010, Tsinghua Science and Technology, V15, P467, DOI 10.1016/S1007-0214(10)70089-4
[9]   A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal [J].
Chen, Lu ;
Bostel, Nathalie ;
Dejax, Pierre ;
Cai, Jianguo ;
Xi, Lifeng .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (01) :40-58
[10]   Multiship Crane Sequencing with Yard Congestion Constraints [J].
Choo, Shawn ;
Klabjan, Diego ;
Simchi-Levi, David .
TRANSPORTATION SCIENCE, 2010, 44 (01) :98-115