共 50 条
- [41] RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT REVISTA BRASILEIRA DE CIENCIA DO SOLO, 2015, 39 (06): : 1776 - 1785
- [42] New pelton runners for the kueblis hydroelectric power plant International Water Power and Dam Construction, 1994, 46 (02): : 26 - 28
- [43] Optimal Response of a Hydroelectric Power Plant with Bilateral Contracts MELECON 2010: THE 15TH IEEE MEDITERRANEAN ELECTROTECHNICAL CONFERENCE, 2010, : 237 - 242
- [44] Automatic generation control of the Caruachi hydroelectric power plant 2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: LATIN AMERICA, VOLS 1-3, 2006, : 1120 - +
- [48] Steel Building for the Assembly of Parts for Hydroelectric Power Plant BAUINGENIEUR, 2015, 90 : A21 - A21
- [50] Deterministic optimal management strategy of hydroelectric power plant TERRAGREEN 2012: CLEAN ENERGY SOLUTIONS FOR SUSTAINABLE ENVIRONMENT (CESSE), 2012, 18 : 225 - 234