Co-design of Model-Reference Scheduling and Control

被引:0
|
作者
Zhao, Shunli [1 ,2 ]
Ji, Yuehui [1 ]
机构
[1] Tianjin Univ Technol, Tianjin Key Lab Control Theory & Applicat Complic, Tianjin, Peoples R China
[2] Tianjin Univ Technol, Sch Elect & Elect Engn, Tianjin, Peoples R China
来源
2018 37TH CHINESE CONTROL CONFERENCE (CCC) | 2018年
关键词
Networked control system; model-reference; co-design; scheduling; NETWORKED CONTROL; SYSTEMS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
There have been growing concerns in networked control system with communication constraints. In the paper, a model -reference scheduling scheme is proposed for optimizing the distribution of the network resource. The states are determined to gain the access to the network by computing the difference between the real system and the ideal system. The stability analysis and the joint design of the controller and scheduling are given by formulating the problem as a linear equality equation that can be solved efficiently. The proposed strategy is evaluated through a simple simulation.
引用
收藏
页码:6465 / 6468
页数:4
相关论文
共 50 条
  • [1] Network Scheduling and Optimal Guaranteed Cost Control Co-Design
    Chen, Jinbiao
    Lei, Bicheng
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 4366 - 4371
  • [2] Co-design of scheduling and Control for Networked Motion Control Systems
    Zhao Weiquan
    Li Di
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 5, 2008, : 104 - 108
  • [3] Scheduling and Control Co-Design for Control Systems under Computational Constraints
    Zhao, Yun-Bo
    Dong, Hui
    Ni, Hongjie
    IFAC PAPERSONLINE, 2017, 50 (01): : 5881 - 5886
  • [4] Optimal Co-design of Control Algorithm and Bandwidth Scheduling for Networked Control Systems
    Chen, Rong
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-3, 2011, 314-316 : 2124 - 2131
  • [5] Control and scheduling co-design for time-delay networked control systems
    Wang Yan
    Xie Lin-bai
    Hu Wei-li
    Proceedings of the 2007 Chinese Control and Decision Conference, 2007, : 656 - 660
  • [6] On the strategy of scheduling and control co-design in networked control system
    Chen Bo
    Wang Changhong
    PROCEEDINGS OF THE 24TH CHINESE CONTROL CONFERENCE, VOLS 1 AND 2, 2005, : 237 - 239
  • [7] A Model-Driven Co-Design Framework for Fusing Control and Scheduling Viewpoints
    Sundharam, Sakthivel Manikandan
    Navet, Nicolas
    Altmeyer, Sebastian
    Havet, Lionel
    SENSORS, 2018, 18 (02):
  • [8] Co-design of dynamic scheduling and H-infinity control for networked control systems
    Zhou, Chuan
    Du, Mingli
    Chen, Qingwei
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (21) : 10767 - 10775
  • [9] Scheduling and control co-design for delay compensation in the networked control system
    Chen, Liang
    Zhang, Jianming
    Wang, Shuqing
    ASIAN JOURNAL OF CONTROL, 2006, 8 (02) : 124 - 134
  • [10] Dynamic scheduling and robust control co-design for networked control systems
    Wang Yan
    Ji Zhicheng
    Xie Linbo
    Hu Weili
    PROCEEDINGS OF THE 26TH CHINESE CONTROL CONFERENCE, VOL 5, 2007, : 639 - +