A Risk Management System Based on Knowledge for Construction Enterprises

被引:0
作者
Qiu Lina [1 ]
Li Renpu [1 ]
Tang Xinting [1 ]
Zhao Yongsheng [1 ]
机构
[1] Ludong Univ, Sch Psychol & Educ, Yantai 264025, Peoples R China
来源
PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2 | 2008年
关键词
risk management; knowledge; knowledge management; construction enterprise;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Now our country is experiencing a peak of engineering and construction. In order to deal with the increasing engineering risks, it is very necessary to improve the risk management level for Chinese construction enterprises. In this paper, risk management problems in construction enterprises are firstly analyzed. And then a knowledge flow model for construction enterprises is established from the view of knowledge management. Finally a risk management system based on knowledge is presented for construction enterprises and some safeguard measures for ensuring the system operation are also proposed. The system proposed can provide many advantages to construction enterprises such as enhancing risk management consciousness, identifying engineering risks and improving risk recognition and analysis level.
引用
收藏
页码:485 / 488
页数:4
相关论文
共 8 条
[1]  
Becker J, 2004, 15TH INTERNATIONAL WORKSHOP ON DATABASE AND EXPERT SYSTEMS APPLICATIONS, PROCEEDINGS, P482
[2]  
GRETTON I, 1993, PROFESSIONAL MANAGER, P5
[3]   Application of a fuzzy based decision making methodology to construction project risk assessment [J].
Zeng, Jiahao ;
An, Min ;
Smith, Nigel John .
International Journal of Project Management, 2007, 25 (06) :589-600
[4]   Mismanagement of tacit knowledge: the importance of tacit knowledge, the danger of information technology, and what to do about it [J].
Johannessen, JA ;
Olaisen, J ;
Olsen, B .
INTERNATIONAL JOURNAL OF INFORMATION MANAGEMENT, 2001, 21 (01) :3-20
[5]  
NONAKA I, 1991, HARVARD BUS REV, V69, P96
[6]  
Uher I. E., 1999, INT J PROJ MANAG, V17, P161, DOI DOI 10.1016/S0263-7863(98)00024-6
[7]  
WANG D, 2002, REALIZATION KNOWLEDG
[8]  
ZOU PX, 2006, P 12 PAC RIM REAL ES, V1, P22