A multi-objective optimisation algorithm for the hot rolling batch scheduling problem

被引:55
|
作者
Jia, S. J. [1 ,2 ]
Yi, J. [3 ,4 ]
Yang, G. K. [1 ,2 ]
Du, B. [1 ,2 ,4 ]
Zhu, J. [3 ,4 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Automat, Shanghai 200030, Peoples R China
[2] Minist Educ China, Key Lab Syst Control & Informat Proc, Shanghai, Peoples R China
[3] Northeastern Univ, Sch Informat Sci & Engn, Shenyang, Peoples R China
[4] Acad Baoshan Iron & Steel Co Ltd, Res Inst Automat, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
ant colony optimisation; Pareto optimisation; hot rolling batch scheduling; multi-objective optimisation; ANT COLONY OPTIMIZATION; SYSTEM;
D O I
10.1080/00207543.2011.654138
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The hot rolling batch scheduling problem is a hard problem in the steel industry. In this paper, the problem is formulated as a multi-objective prize collecting vehicle routing problem (PCVRP) model. In order to avoid the selection of weight coefficients encountered in single objective optimisation, a multi-objective optimisation algorithm based on Pareto-dominance is used to solve this model. Firstly, the Pareto M????MI?? Ant System (P-MMAS), which is a brand new multi-objective ant colony optimisation algorithm, is proposed to minimise the penalties caused by jumps between adjacent slabs, and simultaneously maximise the prizes collected. Then a multi-objective decision-making approach based on TOPSIS is used to select a final rolling batch from the Pareto-optimal solutions provided by P-MMAS. The experimental results using practical production data from Shanghai Baoshan Iron & Steel Co., Ltd. have indicated that the proposed model and algorithm are effective and efficient.
引用
收藏
页码:667 / 681
页数:15
相关论文
共 50 条
  • [41] Evolutionary Dynamic Multi-objective Optimisation: A Survey
    Jiang, Shouyong
    Zou, Juan
    Yang, Shengxiang
    Yao, Xin
    ACM COMPUTING SURVEYS, 2023, 55 (04)
  • [42] Multi-objective genetic algorithm for cell formation problem considering cellular layout and operations scheduling
    Arkat, Jamal
    Farahani, Mehdi Hosseinabadi
    Ahmadizar, Fardin
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2012, 25 (07) : 625 - 635
  • [43] A GRASP heuristic for the multi-objective permutation flowshop scheduling problem
    Claudio Arroyo, Jose Elias
    de Souza Pereira, Ana Amelia
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (5-8) : 741 - 753
  • [44] Smart grid planning method based on multi-objective particle swarm optimisation algorithm
    Zhang, Jianguang
    INTERNATIONAL JOURNAL OF COMPUTING SCIENCE AND MATHEMATICS, 2021, 13 (01) : 22 - 31
  • [45] A multi-objective genetic algorithm for optimisation of energy consumption and shop floor production performance
    Liu, Ying
    Dong, Haibo
    Lohse, Niels
    Petrovic, Sanja
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 179 : 259 - 272
  • [46] Multi-objective Particle Swarm Optimisation for Phase Specific Cancer Drug Scheduling
    Alam, Mohammad S.
    Algoul, Saleh
    Hossain, M. Alamgir
    Majumder, M. A. Azim
    COMPUTATIONAL SYSTEMS-BIOLOGY AND BIOINFORMATICS, 2010, 115 : 180 - 192
  • [47] Multi-objective optimisation models for the travelling salesman problem with horizontal cooperation
    Defryn, Christof
    Sorensen, Kenneth
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 267 (03) : 891 - 903
  • [48] Energy Consumption Scheduling of Smart Homes with Microgrid under Multi-objective Optimisation
    Zhang, Di
    Evangelisti, Sara
    Lettieri, Paola
    Papageorgiou, Lazaros G.
    12TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING AND 25TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT C, 2015, 37 : 2441 - 2446
  • [49] The optimisation of block caving production scheduling with geometallurgical uncertainty - a multi-objective approach
    Sepulveda, E.
    Dowd, P. A.
    Xu, C.
    MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2018, 127 (03) : 131 - 145
  • [50] A multi-objective optimisation algorithm for a drilling trajectory constrained to wellbore stability
    Huang, Wendi
    Wu, Min
    Hu, Jie
    Chen, Luefeng
    Lu, Chengda
    Chen, Xin
    Cao, Weihua
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2022, 53 (01) : 154 - 167