Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand

被引:139
作者
Glock, Christoph H. [1 ]
机构
[1] Univ Wurzburg, Fac Econ, Chair Business Management & Ind Management, D-97070 Wurzburg, Germany
关键词
Lead time reduction; Variable production rate; Single vendor; Single buyer; Integrated inventory model; QUALITY IMPROVEMENT; HEURISTIC SOLUTION; COST REDUCTION; SYSTEM;
D O I
10.1016/j.ijpe.2011.09.007
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies alternative methods for reducing lead time and their impact on the safety stock and the expected total costs of a (Q,s) continuous review inventory control system. We focus on a single-vendor-single-buyer integrated inventory model with stochastic demand and variable, lot size-dependent lead time and assume that lead time consists of production and setup and transportation time. As a consequence, lead time may be reduced by crashing setup and transportation time, by increasing the production rate, or by reducing the lot size. We illustrate the benefits of reducing lead time in numerical examples and show that lead time reduction is especially beneficial in case of high demand uncertainty. Further, our studies indicate that a mixture of setup time and production time reduction is appropriate to lower expected total costs. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:37 / 44
页数:8
相关论文
共 39 条
[21]   ECONOMIC PRODUCTION LOT-SIZE MODEL WITH VARIABLE PRODUCTION-RATE AND IMPERFECT QUALITY [J].
KHOUJA, M ;
MEHREZ, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (12) :1405-1417
[22]   LOT-SIZE DEPENDENT LEAD TIMES IN A Q,R INVENTORY SYSTEM [J].
KIM, JS ;
BENTON, WC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (01) :41-58
[23]   SIMULTANEOUS DETERMINATION OF PRODUCTION CYCLE AND INSPECTION SCHEDULES IN A PRODUCTION SYSTEM [J].
LEE, HL ;
ROSENBLATT, MJ .
MANAGEMENT SCIENCE, 1987, 33 (09) :1125-1136
[24]   Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm [J].
Maiti, Manas Kumar ;
Maiti, Manoranjan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 179 (02) :352-371
[25]   Integrated vendor-buyer cooperative models with Stochastic demand in controllable lead time [J].
Ouyang, LY ;
Wu, KS ;
Ho, CH .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 92 (03) :255-266
[26]   Lot size reorder point inventory model with controllable lead time and set-up cost [J].
Ouyang, LY ;
Chang, HC .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2002, 33 (08) :635-642
[27]  
Ouyang LY, 1996, J OPER RES SOC, V47, P829, DOI 10.1057/palgrave.jors.0470610
[28]   The learning effect on setup cost reduction for mixture inventory models with variable lead time [J].
Pan, Jason Chao-Hsien ;
Lo, Ming-Cheng .
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2008, 25 (04) :513-529
[29]   A study of an integrated inventory with controllable lead time [J].
Pan, JCH ;
Yang, JS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (05) :1263-1273
[30]   INVESTING IN REDUCED SETUPS IN THE EOQ MODEL [J].
PORTEUS, EL .
MANAGEMENT SCIENCE, 1985, 31 (08) :998-1010