A quantitative model for disruption mitigation in a supply chain

被引:73
作者
Paul, Sanjoy Kumar [1 ]
Sarker, Ruhul [2 ]
Essam, Daryl [2 ]
机构
[1] RMIT Univ, Sch Business IT & Logist, Melbourne, Vic, Australia
[2] Univ New South Wales, Sch Engn & Informat Technol, Canberra, ACT, Australia
关键词
Supply chain; Mitigation; Production disruption; Quantitative model; Heuristic; PRODUCTION-INVENTORY SYSTEM; RELIABILITY CONSIDERATIONS; CYCLIC SCHEDULES; RECOVERY MODEL; TIME; DEMAND; MANAGEMENT; RISKS; COORDINATION; UNCERTAINTY;
D O I
10.1016/j.ejor.2016.08.035
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, a three-stage supply chain network, with multiple manufacturing plants, distribution centers and retailers, is considered. For this supply chain system we develop three different approaches, (i) an ideal plan for an infinite planning horizon and an updated plan if there are any changes in the data, (ii) a predictive mitigation planning approach for managing predictive demand changes, which can be predicted in advance by using an appropriate tool, and (iii) a reactive mitigation plan, on a real-time basis, for managing sudden production disruptions, which cannot be predicted in advance. In predictive mitigation planning, we develop a fuzzy inference system (FIS) tool to predict the changes in future demand over the base forecast and the supply chain plan is revised accordingly well in advance. In reactive mitigation planning, we formulate a quantitative model for revising production and distribution plans, over a finite future planning period, while minimizing the total supply chain cost. We also consider a series of sudden disruptions, where a new disruption may or may not affect the recovery plans of earlier disruptions and which consequently require plans to be revised after the occurrence of each disruption on a real-time basis. An efficient heuristic, capable of dealing with sudden production disruptions on a real-time basis, is developed. We compare the heuristic results with those obtained from the LINGO optimization software for a good number of randomly generated test problems. Also, some numerical examples are presented to explain both the usefulness and advantages of the proposed approaches. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:881 / 895
页数:15
相关论文
共 50 条
[31]   Development of a production inventory model with uncertainty and reliability considerations [J].
Paul, Sanjoy Kumar ;
Azeem, Abdullahil ;
Sarker, Ruhul ;
Essam, Daryl .
OPTIMIZATION AND ENGINEERING, 2014, 15 (03) :697-720
[32]   Real time disruption management for a two-stage batch production-inventory system with reliability considerations [J].
Paul, Sanjoy Kumar ;
Sarker, Ruhul ;
Essam, Daryl .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (01) :113-128
[33]  
Paul SK, 2013, LECT NOTES COMPUT SC, V8104, P511, DOI 10.1007/978-3-642-40925-7_47
[34]   Coordinated control of distribution supply chains in the presence of fuzzy customer demand [J].
Petrovic, Dobrila ;
Xie, Ying ;
Burnham, Keith ;
Petrovic, Radivoj .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (01) :146-158
[35]   Two inventory review policies on supply chain configuration problem [J].
Purnomo, Elindriyanto D. ;
Wee, Hui M. ;
Praharsi, Yugowati .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (02) :448-455
[36]  
Qi L, 2009, PROD OPER MANAG, V18, P516, DOI [10.3401/poms.1080.01026, 10.1111/j.1937-5956.2009.01026.x]
[37]   Supply chain coordination with demand disruptions [J].
Qi, XT ;
Bard, JF ;
Yu, G .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2004, 32 (04) :301-312
[38]   Supply disruptions with time-dependent parameters [J].
Ross, Andrew M. ;
Rong, Ying ;
Snyder, Lawrence V. .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (11) :3504-3529
[39]   A collaborating inventory model in a supply chain [J].
Sana, Shib Sankar .
ECONOMIC MODELLING, 2012, 29 (05) :2016-2023
[40]   A production-inventory model of imperfect quality products in a three-layer supply chain [J].
Sana, Shib Sankar .
DECISION SUPPORT SYSTEMS, 2011, 50 (02) :539-547