Medium-Term Load Matching in Power Planning

被引:3
作者
Nabona, Narcis [1 ]
机构
[1] Univ Politecn Cataluna, Dept Stat & Operat Res, ES-08034 Barcelona, Spain
关键词
Bloom and gallant formulation; heuristics; load matching; medium-term power planning; ELECTRICITY MARKETS; DISPATCH CONSTRAINTS; MODEL; EQUILIBRIA; MANAGEMENT; BLOOM;
D O I
10.1109/TPWRS.2012.2220788
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The medium-term planning for a company participating in a pure pool market can be considered under different behavioral principles: cartel, endogenous cartel with respect to hydro generation, and equilibrium. One of the important aspects of the model is the medium-term load matching, where load is represented by the load duration curves of each period into which the medium-term horizon is subdivided. The probabilistically exact Bloom and Gallant formulation of load matching could be employed, but its exponential number of load-matching inequality constraints limits its use to small cases. A heuristic has been proposed where only a small subset of the load-matching constraints, hopefully containing the active ones at the optimizer, is employed. This heuristic does not perform totally well with the more complex models, as those of endogenous cartel and equilibrium behavior, and a more comprehensive heuristic procedure is presented here. A well-known alternative method of medium-term load matching is the multi-block approximation to the load duration curve. The three load-matching techniques mentioned above are here described and are compared, and computational results for realistic systems are analyzed for the different behavioral models, showing the advantages of each procedure.
引用
收藏
页码:1073 / 1082
页数:10
相关论文
共 50 条
[1]   Medium-term power planning in electricity markets with pool and bilateral contracts [J].
Mari, L. ;
Nabona, N. ;
Pages-Bernaus, A. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (02) :432-443
[2]   An Oligopoly Model for Medium-Term Power Planning in a Liberalized Electricity Market [J].
Tesser, Matteo ;
Pages, Adela ;
Nabona, Narcis .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (01) :67-77
[3]   Renewable Energies in Medium-Term Power Planning [J].
Mari, Laura ;
Nabona, Narcis .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (01) :88-97
[4]   Medium-term planning for thermal electricity production [J].
Kovacevic, Raimund M. ;
Paraschiv, Florentina .
OR SPECTRUM, 2014, 36 (03) :723-759
[5]   Benchmarking in medium-term economic planning in the forest district [J].
Wysocka-Fijorek, Emilia .
SYLWAN, 2019, 163 (04) :279-291
[6]   Medium-term Rail Planning at Rio Tinto Iron Ore [J].
Garcia-Flores, R. ;
Singh, G. ;
Ernst, A. ;
Welgama, P. .
19TH INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION (MODSIM2011), 2011, :311-317
[7]   Enhanced Deep Networks for short-Term and Medium-Term Load Forecasting [J].
Han, Lingyi ;
Peng, Yuexing ;
Li, Yonghui ;
Yong, Binbin ;
Zhou, Qingguo ;
Shu, Lei .
IEEE ACCESS, 2019, 7 :4045-4055
[8]   Medium-Term Forecasts of Load Profiles in Polish Power System including E-Mobility Development [J].
Piotrowski, Pawel ;
Baczynski, Dariusz ;
Kopyt, Marcin .
ENERGIES, 2022, 15 (15)
[9]   Medium-term scheduling of operating states in electric power systems [J].
Aizenberg, N. ;
Palamarchuk, S. .
GLOBAL ENERGY INTERCONNECTION-CHINA, 2022, 5 (05) :472-483
[10]   A New Methodology to Obtain a Feasible Thermal Operation in Power Systems in a Medium-Term Horizon [J].
Montero, Luis ;
Bello, Antonio ;
Reneses, Javier .
ENERGIES, 2020, 13 (12)