Two AHP models of high and new technology product development projects risk assessment

被引:0
作者
Lv, YJ [1 ]
Zeng, XL [1 ]
机构
[1] Guangxi Univ, Nanning 530004, Peoples R China
来源
NEW TRENDS OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN NEW CENTURY | 2001年
关键词
product development; risk assessment; AHP;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The high and new technology industrialization risk assessment includes lots of complicated factors. In this paper we First study an AHP model of the risk assessment, then, we deeply analyses the conditions of AHP applied to risk assessment and the reason why the 1-9 scale is not fit for risk assessment. In this paper we also give two improved AHP models for risk assessment.
引用
收藏
页码:554 / 559
页数:6
相关论文
共 50 条
[41]   Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects [J].
Aminbakhsh, Saman ;
Gunduz, Murat ;
Sonmez, Rifat .
JOURNAL OF SAFETY RESEARCH, 2013, 46 :99-105
[42]   Life cycle risk assessment of PPP infrastructure projects using fuzzy Analytical Hierarchy Process (AHP) [J].
Li, Jie ;
Peng, Yuan ;
Zou, Patrick X. W. .
PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, :1000-1016
[43]   A new rough cloud AHP method for risk evaluation of public-private partnership projects [J].
Song, Wenyan ;
Zhu, Yue ;
Zhou, Jianbo ;
Chen, Zhiyu ;
Zhou, Jiantao .
SOFT COMPUTING, 2022, 26 (04) :2045-2062
[44]   A survey of activity network-based process models for managing product development projects [J].
Browning, Tyson R. ;
Ramasesh, Ranga V. .
PRODUCTION AND OPERATIONS MANAGEMENT, 2007, 16 (02) :217-240
[45]   A risk mitigation methodology for new product and process design in concurrent engineering projects [J].
Kayis, B. ;
Arndt, G. ;
Zhou, M. ;
Amornsawadwatana, S. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2007, 56 (01) :167-170
[46]   Construction Projects Assessment Based on the Sustainable Development Criteria by an Integrated Fuzzy AHP and Improved GRA Model [J].
Hatefi, Seyed Morteza ;
Tamosaitiene, Jolanta .
SUSTAINABILITY, 2018, 10 (04)
[47]   Determinants of knowledge transfer in inter-firm new product development projects [J].
Lawson, Benn ;
Potter, Antony .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2012, 32 (10) :1228-1247
[48]   Antecedents and consequences of teamwork quality in new product development projects An empirical investigation [J].
Dayan, Mumin ;
Di Benedetto, C. .
EUROPEAN JOURNAL OF INNOVATION MANAGEMENT, 2009, 12 (01) :129-+
[49]   New product development projects and project manager skill sets in the telecommunications industry [J].
Kosaroglu, Mustafa ;
Hunt, Robert Alan .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2009, 2 (02) :308-317
[50]   Early involvement of suppliers in new product development projects Advantages, risks and imperatives [J].
Zolghadri, Marc ;
Zouggar, Salah ;
Rasoulifar, Rahi ;
Girard, Philippe .
JOURNAL OF DECISION SYSTEMS, 2010, 19 (03) :347-365