Two AHP models of high and new technology product development projects risk assessment

被引:0
|
作者
Lv, YJ [1 ]
Zeng, XL [1 ]
机构
[1] Guangxi Univ, Nanning 530004, Peoples R China
来源
NEW TRENDS OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN NEW CENTURY | 2001年
关键词
product development; risk assessment; AHP;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The high and new technology industrialization risk assessment includes lots of complicated factors. In this paper we First study an AHP model of the risk assessment, then, we deeply analyses the conditions of AHP applied to risk assessment and the reason why the 1-9 scale is not fit for risk assessment. In this paper we also give two improved AHP models for risk assessment.
引用
收藏
页码:554 / 559
页数:6
相关论文
共 50 条
  • [1] Risk assessment of R&D projects: a new approach based on IVIF AHP and fuzzy axiomatic design
    Ilbahar, Esra
    Cebi, Selcuk
    Kahraman, Cengiz
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2022, 42 (01) : 605 - 614
  • [2] Risk assessment of RD projects: A new approach based on IVIF AHP and fuzzy axiomatic design
    Ilbahar E.
    Cebi S.
    Kahraman C.
    Journal of Intelligent and Fuzzy Systems, 2022, 42 (01): : 605 - 614
  • [3] Development Risk Assessment in Software Projects using Dependability Models
    Melo, A.
    Tavares, E.
    Marinho, M.
    Sousa, E.
    Nogueira, B.
    Maciel, P.
    2013 IEEE 16TH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND ENGINEERING (CSE 2013), 2013, : 260 - 267
  • [4] Risk assessment of option performance for new product and process development projects in the chemical industry: a case study
    Shaw, NE
    Burgess, TF
    De Mattos, C
    JOURNAL OF RISK RESEARCH, 2005, 8 (7-8) : 693 - 711
  • [5] Risk assessment in product development
    Xie Xiaoling
    Hu Xiaoling
    TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 282 - 286
  • [6] A New Risk Assessment Quantitative Method Based on Fuzzy AHP
    Wang Lijian
    Wang Bin
    Peng Yongjun
    2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 822 - 826
  • [7] Application of a Fuzzy AHP Method to Risk Assessment of International Construction Projects
    Chen, Peihong
    Wang, Jiaqiong
    ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 459 - +
  • [8] SUCCESS FACTORS FOR PRODUCT DEVELOPMENT AND NEW PRODUCT LAUNCH PROJECTS
    Fabo, Ladislav
    Supekova, Sona Chovanova
    Durda, Lukas
    Gajdka, Krzysztof
    MARKETING AND MANAGEMENT OF INNOVATIONS, 2023, 14 (02): : 196 - 207
  • [9] Delay Risk Assessment Models for Road Projects
    Antoniou, Fani
    SYSTEMS, 2021, 9 (03):
  • [10] Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects
    Li, Jie
    Zou, Patrick X. W.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (12): : 1205 - 1209