共 45 条
[3]
Babendererde S., 2006, GEOTECHNICAL RISK RO, P1286
[5]
Benz W., 1993, P 24 LUN PLAN SCI C, P99
[7]
Buchi E. T., 1992, P TBM S STOCKH
[8]
Camusso M., 2009, INT J GEOMECH, V9, P217, DOI DOI 10.1061/(ASCE)1532-3641(2009)9:5(217)
[10]
OBSERVATIONS OF CRACK-GROWTH IN HARD ROCK LOADED BY AN INDENTER
[J].
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES,
1984, 21 (02)
:97-107