Robust Design of Pillar Arrangement for Safe Room-and-Pillar Mining Method

被引:6
|
作者
Kim, Jong-Gwan [1 ]
Ali, Mahrous A. M. [2 ]
Yang, Hyung-Sik [3 ]
机构
[1] Korea Resources Corp, Technol Management Div, Technol Planning Team, Wonju, South Korea
[2] Al Azhar Univ, Fac Engn, Min & Petr Engn Dept, Qena, Egypt
[3] Chonnam Natl Univ, Dept Energy & Resources Engn, Gwangju, South Korea
关键词
Room-and-pillar method; Pillar superposition; Crown pillar; Robust design; UNDERGROUND STONE MINES;
D O I
10.1007/s10706-018-0734-1
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The arrangement of pillars is a key design parameter in the execution of the room-and-pillar mining method. The objective of this study is to provide safe, reliable and a robust design for pillar arrangements for economic and efficient mineral recovery. Four design parameters have been considered in this study, including the degree of pillar superposition, pillar stiffness, and the pillar width; and the distance between crown pillars. The numerical analysis shows that the stability of mines is significantly affected by the discordance of the pillar arrangement between adjacent levels along with four design factors (e.g. pillar stiffness, overlap ratio, and width and thickness of the crown pillar). The pillar stiffness had the highest average affecting ratio (e.g. 71.8%), while the average affecting ratios of the pillar width, thickness of the crown pillar, and pillar overlap ratio were 18.9%, 5.77%, and 3.6%, respectively. The stiffness had the greatest influence on the safety factor when the strength/stress ratio was used to calculate the safety factor.
引用
收藏
页码:1931 / 1942
页数:12
相关论文
共 50 条
  • [21] Geotechnical risk management to prevent coal outburst in room-and-pillar mining
    Peter, Zhang
    Scott, Peterson
    Dan, Neilans
    Scott, Wade
    Ryan, McGrady
    Joe, Pugh
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2016, 26 (01) : 9 - 18
  • [22] Proposed formulas for pillar stress estimation in a regular room-and-pillar pattern
    Vlachogiannis, Ioannis
    Benardos, Andreas
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2024, 180
  • [23] Zones of technogenic water-conducting cracks by room-and-pillar mining
    Zubkov, V. V.
    Zubkova, I. A.
    GEOMECHANICS AND GEODYNAMICS OF ROCK MASSES (EUROCK2018), VOLS 1 AND 2, 2018, : 1081 - 1083
  • [24] Geotechnical risk management to prevent coal outburst in room-and-pillar mining
    Zhang Peter
    Peterson Scott
    Neilans Dan
    Wade Scott
    Mc Grady Ryan
    Pugh Joe
    InternationalJournalofMiningScienceandTechnology, 2016, 26 (01) : 9 - 18
  • [25] Simulation of cascading pillar failure in room-and-pillar mines using boundary-element-method
    Zipf, RK
    ROCK MECHANICS TOOLS AND TECHNIQUES, VOLS 1 AND 2, 1996, : 1887 - 1892
  • [26] Strength calculations of block elements of room-and-pillar mining under permafrost conditions
    Buzilo, V.
    Savelieva, T.
    Saveliev, V.
    NEW TECHNIQUES AND TECHNOLOGIES IN MINING, 2010, : 47 - 50
  • [27] ROOM-AND-PILLAR MINING AT PRINCE MINE OF CAPE-BRETON DEVELOPMENT CORPORATION
    MACLEAN, AR
    MERNER, D
    CIM BULLETIN, 1977, 70 (779): : 80 - 80
  • [28] Technological and Geomechanical Parameters of Room-and-Pillar System of Mining a Thick Flat Seam
    P. V. Egorov
    S. I. Kalinin
    B. P. Agudalin
    Journal of Mining Science, 2001, 37 : 472 - 474
  • [29] APPLICATION OF WORKSTATION SOFTWARE TO NUMERICAL MODELING OF ROOM-AND-PILLAR COAL-MINING
    FAMA, MED
    FOLLINGTON, IL
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1992, 101 : A89 - A94
  • [30] Technological and geomechanical parameters of room-and-pillar system of mining a thick flat seam
    Egorov, PV
    Kalinin, SI
    Agudalin, BP
    JOURNAL OF MINING SCIENCE, 2001, 37 (05) : 472 - 474