Robust Design of Pillar Arrangement for Safe Room-and-Pillar Mining Method

被引:6
|
作者
Kim, Jong-Gwan [1 ]
Ali, Mahrous A. M. [2 ]
Yang, Hyung-Sik [3 ]
机构
[1] Korea Resources Corp, Technol Management Div, Technol Planning Team, Wonju, South Korea
[2] Al Azhar Univ, Fac Engn, Min & Petr Engn Dept, Qena, Egypt
[3] Chonnam Natl Univ, Dept Energy & Resources Engn, Gwangju, South Korea
关键词
Room-and-pillar method; Pillar superposition; Crown pillar; Robust design; UNDERGROUND STONE MINES;
D O I
10.1007/s10706-018-0734-1
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The arrangement of pillars is a key design parameter in the execution of the room-and-pillar mining method. The objective of this study is to provide safe, reliable and a robust design for pillar arrangements for economic and efficient mineral recovery. Four design parameters have been considered in this study, including the degree of pillar superposition, pillar stiffness, and the pillar width; and the distance between crown pillars. The numerical analysis shows that the stability of mines is significantly affected by the discordance of the pillar arrangement between adjacent levels along with four design factors (e.g. pillar stiffness, overlap ratio, and width and thickness of the crown pillar). The pillar stiffness had the highest average affecting ratio (e.g. 71.8%), while the average affecting ratios of the pillar width, thickness of the crown pillar, and pillar overlap ratio were 18.9%, 5.77%, and 3.6%, respectively. The stiffness had the greatest influence on the safety factor when the strength/stress ratio was used to calculate the safety factor.
引用
收藏
页码:1931 / 1942
页数:12
相关论文
共 50 条
  • [1] Robust Design of Pillar Arrangement for Safe Room-and-Pillar Mining Method
    Jong-Gwan Kim
    Mahrous A. M. Ali
    Hyung-Sik Yang
    Geotechnical and Geological Engineering, 2019, 37 : 1931 - 1942
  • [2] Pillar drawing in room-and-pillar mining at Jinshan Gold Mine
    Yu, Rong-Bing
    Wan, Guo-Chun
    2003, Mining Research and Development (23):
  • [3] Automation Advances With Room-and-Pillar Mining
    Fiscor, Steve
    Coal Age, 2023, 128 (04): : 18 - 22
  • [4] Reasonable pillar size design and nugget structural parameters optimization in room-and-pillar mining
    Zhao, Guoyan
    Zhou, Li
    Li, Jinyue
    Yu, Peipei
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2014, 45 (11): : 3943 - 3948
  • [5] ROOM-AND-PILLAR MINING AT DEVCOS PRINCE MINE
    MACLEAN, AR
    MERNER, DR
    CIM BULLETIN, 1978, 71 (794): : 59 - 62
  • [6] Estimating the long-term pillar safety for room-and-pillar ore mining
    L. A. Nazarov
    L. A. Nazarova
    A. M. Freidin
    Zh. K. Alimseitova
    Journal of Mining Science, 2006, 42 : 530 - 539
  • [7] Estimating the long-term pillar safety for room-and-pillar ore mining
    Nazarov, L. A.
    Nazarova, L. A.
    Freidin, A. M.
    Alimseitova, Zh. K.
    JOURNAL OF MINING SCIENCE, 2006, 42 (06) : 530 - 539
  • [8] Design methods to control violent pillar failures in room-and-pillar mines
    Zipf, RK
    Mark, C
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1997, 106 : A124 - A132
  • [9] Ventilation of Mine Workings Exploited by the Room-and-Pillar Mining Method.
    Deniau, Robert
    1600,
  • [10] PILLAR-SPLIT METHOD OF STABILIZING DETERIORATING ROOM-AND-PILLAR OPENINGS
    DICKIE, DE
    SERATA, S
    CIM BULLETIN, 1985, 78 (875): : 73 - 74