Task-failure-driven rebalancing of disassembly lines

被引:121
作者
Altekin, F. Tevhide [1 ]
Akkan, Can [1 ]
机构
[1] Sabanci Univ, Sabanci Sch Management, Istanbul, Turkey
关键词
line balancing; disassembly; predictive-reactive rebalancing; task failures; REVERSE SUPPLY CHAINS; PRODUCT RECOVERY; ISSUES; ALGORITHM; MODEL; CLASSIFICATION; OPTIMIZATION; OPPORTUNITY; MANAGEMENT; QUALITY;
D O I
10.1080/00207543.2011.616915
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Many reverse-logistics systems that collect and reprocess end-of-life products require a disassembly stage. The variability of incoming products and the extent of damage, which is more likely to occur during disassembly than assembly, create significant uncertainty in disassembly tasks, namely the possibility of failed tasks. Such failures may lead to some successor tasks being infeasible, which changes the work content of downstream stations. To improve the profitability of such a disassembly line, a mixed-integer-programming-based, predictive-reactive approach is proposed. In the first step, a predictive balance is created and then, in the second step, given a task failure, the tasks of the disassembled product with that task failure are re-selected and re-assigned to the stations (i.e. the line is rebalanced). In the second step, the objective function models both the profit obtained from the disassembled product and the possible increase in any station's workload beyond the predictive cycle time. Since this rebalancing approach affects the work content of stations, a discrete-event simulation study is also carried out to analyse and compare the performance of disassembly lines for optimally found line balances (predictive and reactive). The results show that, with the proposed approach, 24-32% of the monetary throughput lost due to not taking corrective action can be recovered.
引用
收藏
页码:4955 / 4976
页数:22
相关论文
共 60 条
[21]   Disassembly line in product recovery [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (11) :2569-2589
[22]   A solution approach to the disassembly line balancing problem in the presence of task failures [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (07) :1427-1467
[23]  
Gungor A., 1998, COMPUT IND ENG, V35, P161
[24]   AN ALGORITHM FOR THE LINE BALANCING PROBLEM [J].
GUTJAHR, AL ;
NEMHAUSER, GL .
MANAGEMENT SCIENCE, 1964, 11 (02) :308-315
[25]   Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art [J].
Ilgin, Mehmet Ali ;
Gupta, Surendra M. .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2010, 91 (03) :563-591
[26]   Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach [J].
Jayaraman, V .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (05) :981-998
[27]   Disassembly sequencing for maintenance: a survey [J].
Kang, Jun-Gyu ;
Xirouchakis, P. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2006, 220 (10) :1697-1716
[28]   A case study of serial-flow car disassembly: Ergonomics, productivity and potential system performance [J].
Kazmierczak, Karolina ;
Neumann, W. Patrick ;
Winkel, Jorgen .
HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING, 2007, 17 (04) :331-351
[29]  
Kerr W., 2001, Journal of Cleaner Production, V9, P75, DOI DOI 10.1016/S0959-6526(00)00032-9
[30]   Disassembly scheduling: literature review and future research directions [J].
Kim, H.-J. ;
Lee, D.-H. ;
Xirouchakis, P. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (18-19) :4465-4484