Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system

被引:42
作者
Ramezanian, Reza [1 ]
Saidi-Mehrabad, Mohammad [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
Stochastic lot-sizing and scheduling; Flow shop; Sequence-dependent setup; MIP-based heuristic; Hybrid meta-heuristic; Taguchi method; INTEGRATED MODEL; MULTILEVEL;
D O I
10.1016/j.apm.2012.10.024
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses lot sizing and scheduling problem of a flow shop system with capacity constraints, sequence-dependent setups, uncertain processing times and uncertain multi-product and multi-period demand. The evolution of the uncertain parameters is modeled by means of probability distributions and chance-constrained programming (CCP) theory. A new mixed-integer programming (MIP) model with big bucket time approach is proposed to formulate the problem. Due to the complexity of problem, two MIP-based heuristics with rolling horizon framework named non-permutation heuristic (NPH) and permutation heuristic (PH) have been performed to solve this model. Also, a hybrid meta-heuristic based on a combination of simulated annealing, firefly algorithm and proposed heuristic for scheduling is developed to solve the problem. Additionally, Taguchi method is conducted to calibrate the parameters of the meta-heuristic and select the optimal levels of the algorithm's performance influential factors. Computational results on a set of randomly generated instances show the efficiency of the hybrid meta-heuristic against exact solution algorithm and heuristics. (C) 2012 Elsevier Inc. All rights reserved.
引用
收藏
页码:5134 / 5147
页数:14
相关论文
共 32 条
[1]  
[Anonymous], 2009, THEORY PRACTICE UNCE
[2]  
[Anonymous], 2010, Int. J. Ind. Eng. Comput, DOI DOI 10.5267/J.IJIEC.2010.01.001
[3]  
[Anonymous], 2013, Stochastic Programming
[4]   Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups [J].
Anwar, MF ;
Nagi, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (05) :1447-1470
[5]   Scenario-based planning for lot-sizing and scheduling with uncertain processing times [J].
Beraldi, P ;
Ghiani, G ;
Guerriero, E ;
Grieco, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 101 (01) :140-149
[6]   Dynamic capacitated lot-sizing problems: a classification and review of solution approaches [J].
Buschkuehl, Lisbeth ;
Sahling, Florian ;
Helber, Stefan ;
Tempelmeier, Horst .
OR SPECTRUM, 2010, 32 (02) :231-261
[7]   COST HORIZONS AND CERTAINTY EQUIVALENTS - AN APPROACH TO STOCHASTIC-PROGRAMMING OF HEATING OIL [J].
CHARNES, A ;
COOPER, WW ;
SYMONDS, GH .
MANAGEMENT SCIENCE, 1958, 4 (03) :235-263
[8]  
Chinneck JW, 2008, INT SER OPER RES MAN, pXIX
[9]   Rolling-horizon lot-sizing when set-up times are sequence-dependent [J].
Clark, AR ;
Clark, SJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (10) :2287-2307
[10]   Simultaneous lot sizing and scheduling for multi-product multi-level production [J].
Fandel, Guenter ;
Stammen-Hegene, Cathrin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 104 (02) :308-316