共 37 条
[2]
Anani Angelina, 2017, International Journal of Mining and Mineral Engineering, V8, P96
[3]
Optimizing cut-out distance for maximum coal productivity
[J].
SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL,
2019, 95 (06)
:545-559
[4]
[Anonymous], 2014, 3 INT S BLOCK SUBLEV
[5]
Bala R.J., 2018, Mathematical Modelling of Engineering Problems, V5, P116
[6]
Estimation of reliability-based maintenance time intervals of Load-Haul-Dumper in an underground coal mine
[J].
JOURNAL OF MINING AND ENVIRONMENT,
2018, 9 (03)
:761-770
[7]
Basu A., 1999, INT J SURFACE MINING, V13, P79, DOI DOI 10.1080/09208119908944214
[8]
CCATAMAYO BARRIOS J.H., 2017, THESIS U CHILE SANTI
[9]
CHAMI J., 2012, THESIS U CHILE SANTI
[10]
COCHILCO, 2019, AN EST COBR OTR MIN