共 37 条
- [2] Anani Angelina, 2017, International Journal of Mining and Mineral Engineering, V8, P96
- [3] Optimizing cut-out distance for maximum coal productivity [J]. SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2019, 95 (06): : 545 - 559
- [4] Bala R.J., 2018, MATH MODELLING ENG P, V5, P116, DOI [10.18280/mmep.050209, DOI 10.18280/MMEP.050209]
- [5] Estimation of reliability-based maintenance time intervals of Load-Haul-Dumper in an underground coal mine [J]. JOURNAL OF MINING AND ENVIRONMENT, 2018, 9 (03): : 761 - 770
- [6] Basu A., 1999, INT J SURFACE MINING, V13, P79, DOI [10.1080/09208119908944214, DOI 10.1080/09208119908944214]
- [7] CCATAMAYO BARRIOS J.H., 2017, THESIS U CHILE SANTI
- [8] CHAMI J., 2012, THESIS U CHILE SANTI
- [9] COCHILCO, 2019, AN EST COBR OTR MIN
- [10] CODELCO, 2020, MEM AN 2019