Simplified swarm optimization in disassembly sequencing problems with learning effects

被引:92
作者
Yeh, Wei-Chang [1 ,2 ]
机构
[1] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu 300, Taiwan
[2] Univ Technol Sydney, Fac Engn & Informat Technol, Integrat & Collaborat Lab, Adv Analyt Inst, Sydney, NSW 2007, Australia
关键词
Disassembly sequencing problem; Learning effects; Simplified swarm optimization (SSO); Update mechanism; Self-adaptive parameter control;
D O I
10.1016/j.cor.2011.10.027
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In classical disassembly sequencing problems (DSPs), the disassembly time of each item is assumed fixed and sequence-independent. From a practical perspective, the actual processing time of a component could depend on its position in the sequence. In this paper, a novel DSP called the learning-effect DSP (LDSP) is proposed by considering the general effects of learning in DSP. A modified simplified swarm optimization (SSO) method developed by revising the most recently published variants of SSO is proposed to solve this new problem. The presented SSO scheme improves the update mechanism, which is the core of any soft computing based methods, and revises the self-adaptive parameter control procedure. The conducted computational experiment with up to 500 components reflects the effectiveness of the modified SSO method in terms of final accuracy, convergence speed, and robustness. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2168 / 2177
页数:10
相关论文
共 32 条
[21]   Minimal precedence constraints for integrated assembly and execution planning [J].
Rajan, VN ;
Nof, SY .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1996, 12 (02) :175-186
[22]   A precedence-constrained asymmetric traveling salesman model for disassembly optimization [J].
Sarin, SC ;
Sherali, HD ;
Bhootra, A .
IIE TRANSACTIONS, 2006, 38 (03) :223-237
[23]  
Shi Y., 1999, Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406), P1945, DOI 10.1109/CEC.1999.785511
[24]   A Path Relinking approach for the Team Orienteering Problem [J].
Souffriau, Wouter ;
Vansteenwegen, Pieter ;
Vanden Berghe, Greet ;
Van Oudheusden, Dirk .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (11) :1853-1859
[25]   An integrated approach to disassembly planning and demanufacturing operation [J].
Tang, Y ;
Zhou, MC ;
Caudill, RJ .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (06) :773-784
[26]   Fuzzy-Petri-net-based disassembly planning considering-human factors [J].
Tang, Ying ;
Zhou, MengChu ;
Gao, Meimei .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2006, 36 (04) :718-726
[27]   A note on the total completion time problem in a permutation flowshop with a learning effect [J].
Wu, Chin-Chia ;
Lee, Wen-Chiung .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 192 (01) :343-347
[28]  
Yeh WC, 2008, 972221E007099MY3 NSC
[29]  
Yeh WC, 2011, IEEE T SY A IN PRESS