Project Acceleration via Activity Crashing, Overlapping, and Substitution

被引:52
作者
Vinhaes Gerk, Jose Eduardo
Qassim, Raad Yahya
机构
关键词
Project acceleration; project planning; time-cost tradeoff;
D O I
10.1109/TEM.2008.927786
中图分类号
F [经济];
学科分类号
02 ;
摘要
It is an established fact that projects are almost always behind schedule. Consequently, there is a great need for the allocation of additional resources with a view to accelerating projects, so as to ensure delivery on the planned date. These resources are obtained from project budget contingency, whose purpose is to foresee and budget for delays arising from disruptions, inaccurate activity time and cost estimates, and resource nonavailability when required for the execution of project activities. This type of problem arises both in the planning phase of a project, particularly in the context of bidding, as well as in ongoing projects, including new product development projects. The research reported in this paper provides a mixed-integer nonlinear programming model for the acceleration of projects, employing the simultaneous crashing, overlapping, and substitution of project activities. In order to ensure convergence, this model is transformed exactly into a mixed-integer linear programming model. The assumptions of the model are presented and discussed with engineering project management practice in mind. Application of the model to four examples of different sizes and nature, three of which are practical cases, demonstrates the efficiency of the model, implemented in commercial optimization software, in solving practical project acceleration problems.
引用
收藏
页码:590 / 601
页数:12
相关论文
共 27 条
[1]  
[Anonymous], 1981, SYSTEMS ANAL MANAGEM
[2]  
Bazaraa M.S., 1993, NONLINEAR PROGRAMMIN
[3]   Modeling impacts of process architecture on cost and schedule risk in product development [J].
Browning, TR ;
Eppinger, SD .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2002, 49 (04) :428-442
[4]   Applying the design structure matrix to system decomposition and integration problems: A review and new directions [J].
Browning, TR .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2001, 48 (03) :292-306
[5]   Combining competitive scheme with slack neurons to solve real-time job scheduling problem [J].
Chen, Ruey-Maw ;
Lo, Shih-Tang ;
Huang, Yueh-Min .
EXPERT SYSTEMS WITH APPLICATIONS, 2007, 33 (01) :75-85
[6]  
Demeulemeester E. L., 2002, Project scheduling: A research handbook
[7]  
DOERNER KF, OMEGA INT J IN PRESS
[8]  
ELMAGHRABY SE, 1997, ACTIVITY NETWORK PRO
[9]   A MODEL-BASED METHOD FOR ORGANIZING TASKS IN PRODUCT DEVELOPMENT [J].
EPPINGER, SD ;
WHITNEY, DE ;
SMITH, RP ;
GEBALA, DA .
RESEARCH IN ENGINEERING DESIGN-THEORY APPLICATIONS AND CONCURRENT ENGINEERING, 1994, 6 (01) :1-13
[10]   Model-based Approaches to Managing Concurrent Engineering [J].
Eppinger, Steven D. .
JOURNAL OF ENGINEERING DESIGN, 1991, 2 (04) :283-290