Mixed integer programming to schedule a single-shift workforce under annualized hours

被引:35
作者
Azmat, CS [1 ]
Hürlimann, T [1 ]
Widmer, M [1 ]
机构
[1] Univ Fribourg, DIUF, CH-1700 Fribourg, Switzerland
关键词
mixed integer programming; manpower planning; timetable; human resources;
D O I
10.1023/B:ANOR.0000019105.54898.a4
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Nowadays flexibility is a strategic concept for firms. Indeed workload has to follow, as close as possible, the development of demand throughout the year. However, firms cannot engage and dismiss employees according to production requirements. Thus, workforce scheduling becomes a delicate task. In this paper, four mixed integer programming models are developed to solve the workforce schedule problem for a single- shift. The annualized hour scenario is considered with respect to a set of Swiss legal constrains. Furthermore, the minimal required workforce is guaranteed and it is assumed that each employee is able to perform each task within the team. All employees are full- time workers.
引用
收藏
页码:199 / 215
页数:17
相关论文
共 34 条
[1]   A case study of single shift planning and scheduling under annualized hours: A simple three-step approach [J].
Azmat, CS ;
Widmer, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 153 (01) :148-175
[2]  
BAKER K, 1976, OPERATIONAL RES Q, V27, P115
[3]   Scheduling staff using mixed integer programming [J].
Beaumont, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 98 (03) :473-484
[4]  
BETCHHOLD S, 1991, DECISION SCI, V19, P353
[5]   Integer programming to schedule a hierarchical workforce with variable demands [J].
Billionnet, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 114 (01) :105-114
[6]  
BURNS RN, 1994, 9436 QUEENS SCH BUS
[7]  
BURNS RN, 1995, 9502 QUEENS SCH BUS
[8]  
BURNS RN, 1995, 9511 QUEENS SCH BUS
[9]   An integer programming model for the weekly tour scheduling problem [J].
Çezik, T ;
Günlük, O ;
Luss, H .
NAVAL RESEARCH LOGISTICS, 2001, 48 (07) :607-624
[10]  
CHIFFELLE X, 1995, PRODUCTION PLUS JUST