Peak-load Regulating Adequacy Evaluation in Wind Power Accessed System Considering the Correlation of Wind Farms

被引:0
作者
Li, Yilong [1 ]
You, Dahai [1 ]
Wang, Ke [1 ]
Tian, Ke [1 ]
Pan, Kai [1 ]
机构
[1] Huazhong Univ Sci & Technol, State Key Lab Adv Electromagnet Engn & Technol, Wuhan 430074, Hubei Province, Peoples R China
来源
APPLIED ENERGY TECHNOLOGY, PTS 1 AND 2 | 2013年 / 724-725卷
关键词
wind farms; correlation; Nataf transformation; peak-load regulation; power system;
D O I
10.4028/www.scientific.net/AMR.724-725.522
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There is a certain degree of correlation between the outputs of different wind farms because of their geographic distribution in power grid. And the complementary effect can alleviate the adverse effects of peak-load regulation caused by the large-scale wind power integration. In this paper, Nataf transformation was used to establish wind speed samples of correlative wind farms to get correlative wind power. Based on this, the peak-load regulating adequacy was evaluated using Monte-Carlo method on IEEE-RTS system with wind farms. The result presents the quantitative analysis of the impact of correlative wind farms on peak-load regulating adequacy. And it improves the original peak-load regulating adequacy evaluation based on Monte-Carlo method, which has the relatively conservative results.
引用
收藏
页码:522 / 526
页数:5
相关论文
共 13 条
[1]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]   A new approach to quantify reserve demand in systems with significant installed wind capacity [J].
Doherty, R ;
O'Malley, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :587-595
[3]  
[韩小琪 Han Xiaoqi], 2010, [中国电力, Electric Power], V43, P16
[4]   Hourly wind power variations in the Nordic countries [J].
Holttinen, H .
WIND ENERGY, 2005, 8 (02) :173-195
[5]  
Li Fu-qiang, 2009, Power System Technology, V33, P128
[6]   Nataf transformation based point estimate method [J].
Li HongShuang ;
Lue ZhenZhou ;
Yuan XiuKai .
CHINESE SCIENCE BULLETIN, 2008, 53 (17) :2586-2592
[7]  
Li Wenyuan, 2006, RISK ASSESSMENT POWE, P75
[8]  
Liu P.-L., 1986, Probabilistic Engineering Mechanics, V1, P105, DOI [DOI 10.1016/0266-8920(86)90033-0, 10.1016/0266-8920(86)90033-0]
[9]  
Song Hong-kun, 2007, Electric Power Automation Equipment, V27, P47
[10]  
Xiao Chuang-ying, 2010, Proceedings of the CSEE, V30, P1