Optimal maintenance strategy under renewable warranty with repair time threshold

被引:37
|
作者
Park, Minjae [1 ]
Jung, Ki Mun [2 ]
Park, Dong Ho [3 ]
机构
[1] Hongik Univ, Coll Business Adm, Seoul, South Korea
[2] Kyungsung Univ, Dept Informat Stat, Busan, South Korea
[3] Hallym Univ, Ind Acad Cooperat Fdn, Chunchon, South Korea
基金
新加坡国家研究基金会;
关键词
Expected warranty cost; Failure time; Periodic preventive maintenance; Repair time; Repair time threshold; Two-factor warranty; OPTIMAL BURN-IN; POLICY; COST; REPLACEMENT; AGE; MODELS; SOLD;
D O I
10.1016/j.apm.2016.11.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider a periodic preventive maintenance model, from the manufacturer's perspective, which can be implemented to reduce the maintenance cost of a repairable product during a given warranty period. The product is assumed to deteriorate with age and the warranty policy we adopt in this paper takes into account the two factors of failure time and repair time of the product when the product failure occurs. Under the proposed two-factor warranty, a repair time threshold is pre-determined and if the repair takes more time than that of the threshold, the failed product is replaced with a renewed warranty policy. Otherwise, the product is only minimally repaired to return to the operating state. During such a renewable warranty period, preventive maintenance is conducted to reduce the rate of degradation periodically while the product is in operation. By assuming certain cost structures, we formulate the expected warranty cost during the warranty period from the manufacturer's perspective when a periodic preventive maintenance strategy is adapted. Although more frequent preventive maintenance increases the warranty cost, the chance of product failures would be reduced. The main aim of this paper is to accomplish the optimal trade-off between the warranty cost and the preventive maintenance period by determining the optimal preventive maintenance period that minimizes the total expected warranty cost during the warranty period. Assuming the power law process for the product failures, we illustrate our proposed maintenance model numerically and study the impact of relevant parameters on the optimal preventive maintenance policy. (C) 2016 Elsevier Inc. All rights reserved.
引用
收藏
页码:498 / 508
页数:11
相关论文
共 50 条
  • [31] Optimal Burn-In Time and Preventive Repair Time to Maximizing Availability under Age Maintenance Policy
    Guo, Yan-lan
    Cui, Li-rong
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 763 - 765
  • [32] Cost Optimization of Two-dimensional Warranty under Incomplete Preventive Maintenance Condition
    Cheng, Zhonghua
    Wang, Qian
    Bai, Yongsheng
    Song, Xing
    ENGINEERING LETTERS, 2020, 28 (02) : 510 - 516
  • [33] Optimal warranty policies for systems with imperfect repair
    Yeo, Wee Meng
    Yuan, Xue-Ming
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (01) : 187 - 197
  • [34] Optimal burn-in time to minimize the cost for general repairable products sold under warranty
    Sheu, SH
    Chien, YH
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 163 (02) : 445 - 461
  • [35] Design of a performance-based warranty policy with replacement-repair strategy and cumulative cost threshold
    Dai, Anshu
    Wang, Xin
    Li, Yu
    Li, Ting
    He, Shuguang
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 255
  • [36] An Optimal Strategy Research for the Outsourcing of Warranty Repairs
    Dong, Fang-qi
    Liu, Zi-xian
    Yuan, Jie
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 305 - 312
  • [37] Joint preventive maintenance and extended warranty strategy for leased unreliable equipment submitted to imperfect repair at failure
    Ben Mabrouk, Amel
    Chelbi, Anis
    IFAC PAPERSONLINE, 2022, 55 (10): : 1201 - 1206
  • [38] Stochastic Analysis of an Industrial System with Preparation Time Repair under Warranty Policy
    Hussien, Zienab M.
    El-Sherbeny, Mohamed S.
    APPLIED SCIENCES-BASEL, 2024, 14 (17):
  • [39] Failure modeling and optimizing preventive maintenance strategy during two-dimensional extended warranty contracts
    Shahanaghi, Kamran
    Noorossana, Rassoul
    Jalali-Naini, Seyed Gholamreza
    Heydari, Majeed
    ENGINEERING FAILURE ANALYSIS, 2013, 28 : 90 - 102
  • [40] Optimal warranty design and post-warranty maintenance for products subject to stochastic degradation
    Shang, Lijun
    Si, Shubin
    Sun, Shudong
    Jin, Tongdan
    IISE TRANSACTIONS, 2018, 50 (10) : 913 - 927