Genetic Programming Approach to Learning Multi-pass Heuristics for Resource Constrained Job Scheduling

被引:7
作者
Su Nguyen [1 ]
Thiruvady, Dhananjay [2 ]
Ernst, Andreas [2 ]
Alahakoon, Damminda [1 ]
机构
[1] La Trobe Univ, Melbourne, Vic, Australia
[2] Monash Univ, Melbourne, Vic, Australia
来源
GECCO'18: PROCEEDINGS OF THE 2018 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE | 2018年
关键词
genetic programming; combinatorial optimisation; scheduling; DISPATCHING RULES; COEVOLUTION; DESIGN;
D O I
10.1145/3205455.3205485
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This study considers a resource constrained job scheduling problem. Jobs need to be scheduled on different machines satisfying a due time. If delayed, the jobs incur a penalty which is measured as a weighted tardiness. Furthermore, the jobs use up some proportion of an available resource and hence there are limits on multiple jobs executing at the same time. Due to complex constraints and a large number of decision variables, the existing solution methods, based on meta-heuristics and mathematical programming, are very time-consuming and mainly suitable for small-scale problem instances. We investigate a genetic programming approach to automatically design reusable scheduling heuristics for this problem. A new representation and evaluation mechanisms are developed to provide the evolved heuristics with the ability to effectively construct and refine schedules. The experiments show that the proposed approach is more efficient than other genetic programming algorithms previously developed for evolving scheduling heuristics. In addition, we find that the obtained heuristics can be effectively reused to solve unseen and large-scale instances and often find higher quality solutions compared to algorithms already known in the literature in significantly reduced time-frames.
引用
收藏
页码:1167 / 1174
页数:8
相关论文
共 27 条
[1]  
[Anonymous], 2003, Genetic programming IV: routine human-competitive machine intelligence
[2]  
[Anonymous], 2017, GENETIC PROGRAMMING
[3]   An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem [J].
Ballestin, Francisco ;
Trautmann, Norbert .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (22) :6231-6249
[4]  
Bonyadi MR, 2013, 2013 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), P1037
[5]   Automated Design of Production Scheduling Heuristics: A Review [J].
Branke, Juergen ;
Su Nguyen ;
Pickardt, Christoph W. ;
Zhang, Mengjie .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2016, 20 (01) :110-124
[6]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[7]   On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems [J].
Chand, Shelvin ;
Quang Huynh ;
Singh, Hemant ;
Ray, Tapabrata ;
Wagner, Markus .
INFORMATION SCIENCES, 2018, 432 :146-163
[8]  
Cohen D., 2017, RESOURCE CONSTRAINED, P266
[9]  
Demeulemeester E., 2002, Project Scheduling: A Research Handbook
[10]  
ERNST AT, 2012, IEEE C EVOL COMPUTAT, DOI DOI 10.1109/TRO.2015.2457314