THE IMPACT OF DEMAND AND SUPPLIER ON WINE'S SUPPLY CHAIN PERFORMANCE

被引:3
|
作者
Luis Garcia-Alcaraz, Jorge [1 ]
Alvarado-Iniesta, Alejandro [1 ]
Blanco-Fernandez, Julio [2 ]
Aracely Maldonado-Macias, Aide [1 ]
Jimenez-Macias, Emilio [2 ]
Saenz-Diez Muro, Juan Carlos [2 ]
机构
[1] Autonomous Univ Ciudad Juarez, Ind & Mfg Engn, Av Charro 450 Norte, Ciudad Juarez 32379, Chihuahua, Mexico
[2] Univ La Rioja, Dept Elect Engn, Logrono, La Rioja, Spain
关键词
CRITICAL SUCCESS FACTORS; PRODUCT DEVELOPMENT; MANAGEMENT; FRAMEWORK; SELECTION; MARKET; JIT;
D O I
10.1111/jfpe.12257
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The wine industry is one of the most important income sources in the autonomous community of La Rioja in Spain, and this report is aimed to identify and measure the effect of the latent variables such as Demand, Suppliers, Quality and delivery time on Financial profits for wineries. Latent variables were integrated by the observed variables, and a questionnaire was given to 64 wineries in La Rioja, Spain. A descriptive analysis appears for indicators and latent variables were related using structural equation modeling. The results indicate that there is not a direct effect between an efficient Demand forecasting and Suppliers on the Financial profits for wineries, but there are indirect effects through a Quality and delivery time, the most important variable being analyzed. Managers in wineries must focus their attention on Quality and delivery time to costumers, while having a direct relationship with suppliers. PRACTICAL APPLICATIONS Winery managers must make an effort to have a fast prediction of variants in the forecast and adjust the order to suppliers and production process so that the supply chain can be more agile and with quality and timely deliveries with the final result being the company's financial profit. An agile supply chain with quality products seems to be insignificant for managers in wineries.
引用
收藏
页码:645 / 658
页数:14
相关论文
共 50 条
  • [21] Impact of supplier's lead time and forecast demand updating on retailer's order quantity variability in a two-level supply chain
    So, KC
    Zheng, XN
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 86 (02) : 169 - 179
  • [22] Multi-period demand allocation among supplier in a supply chain
    Singh, Amol
    JOURNAL OF MODELLING IN MANAGEMENT, 2015, 10 (02) : 138 - 157
  • [23] Supplier Performance Evaluation for Green Supply Chain Management
    Grisi, Roberto Maria
    Guerra, Luigi
    Naviglio, Giuseppe
    BUSINESS PERFORMANCE MEASUREMENT AND MANAGEMENT: NEW CONTEXTS, THEMES AND CHALLENGES, 2010, : 149 - 163
  • [24] Performance evaluation on supplier collaboration of agricultural supply chain
    Zhu Y.-X.
    Lee S.-J.
    Zhang J.-Q.
    Zhu, Yan-Xin (zhuyanxin2006@126.com), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (08): : 23 - 36
  • [25] Impact of supplier development on supplier's performance
    Lee, Alfred Bo Shing
    Chan, Felix T. S.
    Pu, Xiaodie
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2018, 118 (06) : 1192 - 1208
  • [26] Impact of supply chain linkages on supply chain performance
    Zelbst, Pamela J.
    Green, Kenneth W., Jr.
    Sower, Victor E.
    Reyes, Pedro
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2009, 109 (5-6) : 665 - 682
  • [27] Impacts of buyers' order batching on the supplier's demand correlation and capacity utilization in a branching supply chain
    Graduate School of Management, Korea Adv. Inst. Sci. and Technol., 207-43, Cheongryangri-dong, Dongdaemun-gu, Seoul, 130-012, Korea, Republic of
    不详
    不详
    Prod Plann Control, 5 (472-485):
  • [28] Impacts of buyers' order batching on the supplier's demand correlation and capacity utilization in a branching supply chain
    Jung, HD
    Ahn, HS
    Ahn, BH
    Rhee, SK
    PRODUCTION PLANNING & CONTROL, 1999, 10 (05) : 472 - 485
  • [29] Contract design for increasing supplier's capacity, in a two-stage supply chain, with stochastic demand
    Nosoohi, Iman
    Nookabadi, Ali Shahandeh
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2514 - 2518
  • [30] Supplier performance and selection from sustainable supply chain performance perspective
    Meena, Purushottam L.
    Katiyar, Rajesh
    Kumar, Gopal
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2023, 72 (08) : 2420 - 2445