Reliability analysis of a rodding anode plant in aluminum industry with multiple units failure and single repairman

被引:3
作者
Al Rahbi, Yaqoob [1 ]
Rizwan, S. M. [1 ]
Alkali, B. M. [2 ]
Cowell, Andrew [2 ]
Taneja, G. [3 ]
机构
[1] Caledonian Coll Engn, Dept Math & Stat, Seeb, Oman
[2] Glasgow Caledonian Univ, Dept Mech Engn, Glasgow, Lanark, Scotland
[3] Maharshi Dayanand Univ, Dept Math, Rohtak, Haryana, India
关键词
Reliability; Semi-Markov; Regenerative point; Failures; Repairs; Rodding anode plant; STOCHASTIC-ANALYSIS; SYSTEM;
D O I
10.1007/s13198-019-00771-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper presents reliability analysis of a rodding anode plant in aluminum industry with multiple unit failure and single repairman. Manufacturing process of raw aluminum blocks in this plant passes through eight stations. Failure of any of the stations brings the plant to a complete halt, except the butt & thimble removal press stations because of the parallel standby arrangement, and does not affect the system operation completely unless both the units fail. Six years of real maintenance data on component failures, repairs and associated costs are used in this analysis. Measures of system effectiveness is gauged through reliability indices such as mean time to plant failure, availability of the plant, busy period of repairman and expected number of repairs. Effect of repair rate, failure rate and repair cost on system performance w.r.t. revenue is shown graphically. Theory of Semi-Markov and regenerative stochastic processes is used in the analysis.
引用
收藏
页码:97 / 109
页数:13
相关论文
共 39 条
[1]  
Al Rahbi Y., 2018, INT J MECH ENG TECH, V9, P695
[2]  
Al Rahbi Yaqoob, 2017, INT J APPL ENG RES, V12, P5616
[3]  
[Anonymous], 2009, P INT C RECENT ADV M, P609
[4]  
[Anonymous], 1962, Renewal theory
[5]   Reliability indices of a redundant system with standby failure and arbitrary distribution for repair and replacement times [J].
Bhardwaj R.K. ;
Kaur K. ;
Malik S.C. .
International Journal of System Assurance Engineering and Management, 2017, 8 (02) :423-431
[6]  
Bhardwaj RK, 2014, INT J SYST DYN APPL, V98, P9
[7]  
Ibe O., 2008, MARKOV PROCESSESTO
[8]   Stochastic analysis of a repairable system with three units and two repair facilities [J].
Li, W ;
Alfa, AS ;
Zhao, YQ .
MICROELECTRONICS AND RELIABILITY, 1998, 38 (04) :585-595
[9]  
Mathew A., 2011, INT J PERFORMABILITY, V7, P179
[10]   Reliability modelling and analysis of a two unit continuous casting plant [J].
Mathew, A. G. ;
Rizwan, S. M. ;
Majumder, M. C. ;
Ramachandran, K. P. .
JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2011, 348 (07) :1488-1505