Study on the Decision of BOT Project Concession Period Based on a Fuzzy Comprehensive Evaluation

被引:0
作者
Yu, Qian [1 ]
Zhang, Yunning [1 ]
机构
[1] Hohai Univ, Sch Business, Nanjing, Jiangsu, Peoples R China
来源
ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4 | 2013年 / 357-360卷
关键词
BOT; concession period; Monte Carlo method; fuzzy comprehensive evaluation; MODEL;
D O I
10.4028/www.scientific.net/AMM.357-360.2299
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In an agreement of a BOT project, concession period is one of the core terms that directly influence the benefits of all parties and the success of a project. Concession period has aroused the attention of both domestic and foreign scholars. This paper summarizes the main influencing factors of the concession period, simulating the NPV of the project income in Monte Carlo method with the probability distribution of the actual situation, selecting corresponding concession period according to a reasonable level of ERR. Based on the simulation results, the scheme of the highest comprehensive utility can be approached with the help of multi-objective fuzzy evaluation model for scheme optimization. And it also provides a possible solution for concession period strategy through the proof of a case.
引用
收藏
页码:2299 / 2303
页数:5
相关论文
共 12 条
[1]  
Gao Lifeng, 2006, COMMERCIAL RES, V12, P24
[2]  
Gao Lifeng, 2008, SCI SCI MANAGEMENT S, V8, P140
[3]  
Li Qiming, 2000, J MANAGEMENT ENG, V14, P43
[4]  
Ng S. Thomas, 2007, International Journal of Project Management, V25, P791, DOI 10.1016/j.ijproman.2007.05.004
[5]  
[秦旋 Qin Xuan], 2005, [管理工程学报, Journal of Industrial Engineering and Engineering Management], V19, P60
[6]   Using bargaining-game theory for negotiating concession period for BOT-type contract [J].
Shen, L. Y. ;
Bao, H. J. ;
Wu, Y. Z. ;
Lu, W. S. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2007, 133 (05) :385-392
[7]   Risk concession model for build/operate/transfer contract projects [J].
Shen, LY ;
Wu, YZ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (02) :211-220
[8]   Alternative concession model for build operate transfer contract projects [J].
Shen, LY ;
Li, H ;
Li, QM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04) :326-330
[9]  
[王东波 Wang Dongbo], 2010, [预测, Forecasting], V29, P58
[10]  
[杨宏伟 Yang Hongwei], 2003, [管理工程学报, Journal of Industrial Engineering and Engineering Management], V17, P93