共 12 条
[1]
Gao Lifeng, 2006, COMMERCIAL RES, V12, P24
[2]
Gao Lifeng, 2008, SCI SCI MANAGEMENT S, V8, P140
[3]
Li Qiming, 2000, J MANAGEMENT ENG, V14, P43
[4]
Ng S. Thomas, 2007, International Journal of Project Management, V25, P791, DOI 10.1016/j.ijproman.2007.05.004
[5]
[秦旋 Qin Xuan], 2005, [管理工程学报, Journal of Industrial Engineering and Engineering Management], V19, P60
[6]
Using bargaining-game theory for negotiating concession period for BOT-type contract
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2007, 133 (05)
:385-392
[7]
Risk concession model for build/operate/transfer contract projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2005, 131 (02)
:211-220
[8]
Alternative concession model for build operate transfer contract projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2002, 128 (04)
:326-330
[9]
[王东波 Wang Dongbo], 2010, [预测, Forecasting], V29, P58
[10]
[杨宏伟 Yang Hongwei], 2003, [管理工程学报, Journal of Industrial Engineering and Engineering Management], V17, P93