A novel optimisation model in the collaborative supply chain with production time capacity consideration

被引:5
|
作者
Purnomo, Muhammad Ridwan Andi [1 ]
Anugerah, Adhe Rizky [2 ]
Aulia, Salvia Fatma [1 ]
'Azzam, Abdullah [1 ]
机构
[1] Univ Islam Indonesia, Dept Ind Engn, Yogyakarta, Indonesia
[2] Univ Putra Malaysia, Inst Trop Forestry & Forest Prod INTROP, Serdang, Malaysia
关键词
Genetic algorithms; Optimisation algorithms; Procurement management; Quality; supply chain management; Collaborative supply chain; GENETIC ALGORITHM;
D O I
10.1108/JEDT-02-2020-0060
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This study aims to propose an optimal procurement model of the collaborative supply chain in the furniture industry. The final output is the total cost minimisation to produce a furniture product that covers material cost, processing cost, transportation cost and holding cost. Therefore, if companies can give the best value to customers at a low cost, then competitive advantages can be achieved. Design/methodology/approach A genetic algorithm (GA) as a metaheuristic approach was used to solve problems in this research. The optimisation was initiated by developing a mathematical model to formulate the objective function. Findings Based on the case study, the proposed GA model was able to reduce the total cost of production. The cost was reduced by 73.09% compared to the existing system. Besides, the production time of the proposed model is within the capacity of both companies; hence, no penalty cost is imposed. Practical implications The proposed GA model has been implemented and tested to minimise production costs in the Indonesian furniture industry. Originality/value To the best of author knowledge, there is no research has proposed an optimisation model that incorporates production cost, transportation cost and production time capacity together in the collaborative supply chain. This research is the first to collaborate these factors using GA in the furniture industry.
引用
收藏
页码:647 / 658
页数:12
相关论文
共 50 条
  • [41] An Integrated Production and Distribution Planning Model in Shrimp Agroindustry Supply Chain
    Herlina, Lely
    Machfud
    Anggraeni, Elisa
    Sukardi
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (01): : 1 - 19
  • [42] A production optimization model of supply-driven chain with quality uncertainty
    Renbin Xiao
    Zhengying Cai
    Xinhui Zhang
    Journal of Systems Science and Systems Engineering, 2012, 21 : 144 - 160
  • [43] A production optimization model of supply-driven chain with quality uncertainty
    Xiao, Renbin
    Cai, Zhengying
    Zhang, Xinhui
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2012, 21 (02) : 144 - 160
  • [44] Stochastic supply chain model with imperfect production and controllable defective rate
    Sarkar, S.
    Giri, B. C.
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2020, 7 (02) : 133 - 146
  • [45] Designing a collaborative supply-chain plan using the analytic hierarchy process and genetic algorithm with cycle-time estimation
    Che, Z. H.
    Chiang, Tzu-An
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (16) : 4426 - 4443
  • [46] Scheduling optimisation of co-operator selection and task allocation in mass customisation supply chain based on collaborative benefits and risks
    Yao, J. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (08) : 2219 - 2239
  • [47] Production lead-time hedging and order allocation in an MTO supply chain
    Zhai, Yue
    Hua, Guowei
    Cheng, Meng
    Cheng, T. C. E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 311 (03) : 887 - 905
  • [48] A supply chain network economic model with time-based competition
    Ma, Jun
    Zhang, Ding
    Dong, June
    Tu , Yiliu
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 280 (03) : 889 - 908
  • [49] Supply chain model with variable lead time under credit policy
    Uthayakumar, R.
    Rameswari, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (1-4) : 389 - 397
  • [50] Supply chain model with variable lead time under credit policy
    R. Uthayakumar
    M. Rameswari
    The International Journal of Advanced Manufacturing Technology, 2013, 64 : 389 - 397