A Modeling Approach to Analyze Variability of Remanufacturing Process Routing

被引:35
作者
Li, Congbo [1 ]
Tang, Ying [2 ]
Li, Chengchuan [1 ]
Li, Lingling [1 ]
机构
[1] Chonqing Univ, State Key Lab Mech Transmiss, Chongqing 400030, Peoples R China
[2] Rowan Univ, Dept Elect & Comp Engn, Glassboro, NJ 08028 USA
基金
中国国家自然科学基金; 高等学校博士学科点专项科研基金;
关键词
Graphical Evaluation and Review Technique (GERT); probability; remanufacturing process routing; time distribution; TIME; INFORMATION;
D O I
10.1109/TASE.2012.2217330
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Remanufacturing is a practice of growing importance due to increasing environmental awareness and regulations. However, little research focuses on stochastic remanufacturing process routings (RPR). This paper presents an analytical method, where four Graphical Evaluation and Review Technique (GERT)-based RPR models are proposed to mathematically represent and analyze the variability of remanufacturing task sequences. In particular, with the method, the probability of individual processes being taken in a remanufacturing system and the time associated with them can be efficiently determined. The proposed method is demonstrated through the remanufacturing of used lathe spindles and telephones, and verified by Arena simulation. Numerical experiments that investigate the relationships between RPR dynamics and other system parameters (such as inventory control for due-time performance and time buffer size for bottleneck control) are included.
引用
收藏
页码:86 / 98
页数:13
相关论文
共 32 条
[1]   GERT analysis of m-consecutive-k-out-of-n systems [J].
Agarwal, Manju ;
Sen, Kanwar ;
Mohan, Pooja .
IEEE TRANSACTIONS ON RELIABILITY, 2007, 56 (01) :26-34
[2]  
[Anonymous], 2013, Parameter estimation and inverse problems, DOI DOI 10.1016/C2009-0-61134-X
[3]  
Atasu, 2008, MANAGE SCI, V54
[4]   Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint [J].
Bayindir, Z. Pelin ;
Erkip, Nesim ;
Gullu, Refik .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (02) :487-514
[5]   Analysis of the production variability in multi-stage manufacturing systems [J].
Colledani, M. ;
Matta, A. ;
Tolio, T. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2010, 59 (01) :449-452
[6]   Multiperiod Remanufacturing Planning With Uncertain Quality of Inputs [J].
Denizel, Meltem ;
Ferguson, Mark ;
Souza, Gilvan 'Gil' C. .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2010, 57 (03) :394-404
[7]   On optimal inventory control with independent stochastic item returns [J].
Fleischmann, M ;
Kuik, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 151 (01) :25-37
[8]   Optimal Acquisition Quantities in Remanufacturing with Condition Uncertainty [J].
Galbreth, Michael R. ;
Blackburn, Joseph D. .
PRODUCTION AND OPERATIONS MANAGEMENT, 2010, 19 (01) :61-69
[9]   The economics of remanufacturing under limited component durability and finite product life cycles [J].
Geyer, Roland ;
Van Wassenhove, Luk N. ;
Atasu, Atalay .
MANAGEMENT SCIENCE, 2007, 53 (01) :88-100
[10]   A machine learning approach for optimal disassembly planning [J].
Grochowski, D. E. ;
Tang, Y. .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2009, 22 (04) :374-383