A discrete artificial bee colony algorithm for the no-idle permutation flowshop scheduling problem with the total tardiness criterion

被引:74
作者
Tasgetiren, M. Fatih [1 ]
Pan, Quan-Ke [2 ]
Suganthan, P. N. [3 ]
Oner, Adalet [1 ]
机构
[1] Yasar Univ, Dept Ind Engn, Izmir, Turkey
[2] Liaocheng Univ, Coll Comp Sci, Liaocheng, Peoples R China
[3] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
基金
美国国家科学基金会;
关键词
Artificial bee colony algorithm; No-idle permutation flowshop scheduling problem; Metaheuristics; Evolutionary algorithms; Genetic algorithm; MINIMIZE; MACHINE; WAIT; OPTIMIZATION; SHOPS; TIME;
D O I
10.1016/j.apm.2013.02.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we present a discrete artificial bee colony algorithm to solve the no-idle permutation flowshop scheduling problem with the total tardiness criterion. The no-idle permutation flowshop problem is a variant of the well-known permutation flowshop scheduling problem where idle time is not allowed on machines. In other words, the start time of processing the first job on a given machine must be delayed in order to satisfy the no-idle constraint. The paper presents the following contributions: First of all, a discrete artificial bee colony algorithm is presented to solve the problem on hand first time in the literature. Secondly, some novel methods of calculating the total tardiness from make-span are introduced for the no-idle permutation flowshop scheduling problem. Finally, the main contribution of the paper is due to the fact that a novel speed-up method for the insertion neighborhood is developed for the total tardiness criterion. The performance of the discrete artificial bee colony algorithm is evaluated against a traditional genetic algorithm. The computational results show its highly competitive performance when compared to the genetic algorithm. Ultimately, we provide the best known solutions for the total tardiness criterion with different due date tightness levels for the first time in the literature for the Taillard's benchmark suit. (C) 2013 Elsevier Inc. All rights reserved.
引用
收藏
页码:6758 / 6779
页数:22
相关论文
共 50 条
  • [31] An Adaptive Iterated Greedy algorithm for distributed mixed no-idle permutation flowshop scheduling problems
    Li, Yuan-Zhen
    Pan, Quan-Ke
    Li, Jun-Qing
    Gao, Liang
    Tasgetiren, M. Fatih
    SWARM AND EVOLUTIONARY COMPUTATION, 2021, 63
  • [32] Iterated reference greedy algorithm for solving distributed no-idle permutation flowshop scheduling problems
    Yine, Kuo-Ching
    Lin, Shih-Wei
    Cheng, Chen-Yang
    He, Cheng-Ding
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 110 : 413 - 423
  • [33] A branch-and-bound approach to the no-idle flowshop scheduling problem
    Jarboui, Bassem
    Eddaly, Mansour
    DISCRETE APPLIED MATHEMATICS, 2024, 347 : 297 - 310
  • [34] Flowshop/no-idle scheduling to minimize total elapsed time
    Narain, L
    Bagga, PC
    JOURNAL OF GLOBAL OPTIMIZATION, 2005, 33 (03) : 349 - 367
  • [35] Beam search-based heuristics for the mixed no-idle flowshop with total flowtime criterion
    Rossi, Fernando Luis
    Nagano, Marcelo Seido
    OR SPECTRUM, 2022, 44 (04) : 1311 - 1346
  • [36] An Iterative Greedy Algorithm With Q-Learning Mechanism for the Multiobjective Distributed No-Idle Permutation Flowshop Scheduling
    Zhao, Fuqing
    Zhuang, Changxue
    Wang, Ling
    Dong, Chenxin
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2024, 54 (05): : 3207 - 3219
  • [37] A Discrete Artificial Bee Colony Algorithm for the Energy-Efficient No-Wait Flowshop Scheduling Problem
    Tasgetiren, M. Fatih
    Yuksel, Damla
    Gao, Liang
    Pan, Quan-Ke
    Li, Peigen
    25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 : 1223 - 1231
  • [38] A Discrete Artificial Bee Colony Algorithm For the Economic Lot Scheduling Problem
    Tasgetiren, M. Fatih
    Bulut, Onder
    Fadiloglu, M. Murat
    2011 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2011, : 347 - 353
  • [39] Flowshop/No-idle Scheduling to Minimize Total Elapsed Time
    Laxmi Narain
    P. C. Bagga
    Journal of Global Optimization, 2005, 33 : 349 - 367
  • [40] An Estimation of Distribution Algorithm-Based Hyper-Heuristic for the Distributed Assembly Mixed No-Idle Permutation Flowshop Scheduling Problem
    Zhao, Fuqing
    Zhu, Bo
    Wang, Ling
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2023, 53 (09): : 5626 - 5637