A discrete artificial bee colony algorithm for the no-idle permutation flowshop scheduling problem with the total tardiness criterion

被引:77
作者
Tasgetiren, M. Fatih [1 ]
Pan, Quan-Ke [2 ]
Suganthan, P. N. [3 ]
Oner, Adalet [1 ]
机构
[1] Yasar Univ, Dept Ind Engn, Izmir, Turkey
[2] Liaocheng Univ, Coll Comp Sci, Liaocheng, Peoples R China
[3] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
基金
美国国家科学基金会;
关键词
Artificial bee colony algorithm; No-idle permutation flowshop scheduling problem; Metaheuristics; Evolutionary algorithms; Genetic algorithm; MINIMIZE; MACHINE; WAIT; OPTIMIZATION; SHOPS; TIME;
D O I
10.1016/j.apm.2013.02.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we present a discrete artificial bee colony algorithm to solve the no-idle permutation flowshop scheduling problem with the total tardiness criterion. The no-idle permutation flowshop problem is a variant of the well-known permutation flowshop scheduling problem where idle time is not allowed on machines. In other words, the start time of processing the first job on a given machine must be delayed in order to satisfy the no-idle constraint. The paper presents the following contributions: First of all, a discrete artificial bee colony algorithm is presented to solve the problem on hand first time in the literature. Secondly, some novel methods of calculating the total tardiness from make-span are introduced for the no-idle permutation flowshop scheduling problem. Finally, the main contribution of the paper is due to the fact that a novel speed-up method for the insertion neighborhood is developed for the total tardiness criterion. The performance of the discrete artificial bee colony algorithm is evaluated against a traditional genetic algorithm. The computational results show its highly competitive performance when compared to the genetic algorithm. Ultimately, we provide the best known solutions for the total tardiness criterion with different due date tightness levels for the first time in the literature for the Taillard's benchmark suit. (C) 2013 Elsevier Inc. All rights reserved.
引用
收藏
页码:6758 / 6779
页数:22
相关论文
共 41 条
[1]   FLOWSHOP NO-IDLE OR NO-WAIT SCHEDULING TO MINIMIZE THE SUM OF COMPLETION TIMES [J].
ADIRI, I ;
POHORYLES, D .
NAVAL RESEARCH LOGISTICS, 1982, 29 (03) :495-504
[2]  
[Anonymous], 2005, Technical Report-TR06
[3]  
[Anonymous], 1994, SCHEDULING THEORY MU, DOI DOI 10.1007/978-94-011-1190-4
[4]  
[Anonymous], 1985, IJCAI
[5]  
Baker K.R., 1981, Journal of Operations Management, V1, P109, DOI DOI 10.1016/0272-6963(81)90014-0
[6]  
Baptiste P, 1997, P INT C IND ENG PROD, P429
[7]   A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time [J].
Baraz, Daniel ;
Mosheiov, Gur .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (02) :810-813
[8]  
Cepek O, 2000, NAV RES LOG, V47, P353, DOI 10.1002/(SICI)1520-6750(200006)47:4<353::AID-NAV5>3.0.CO
[9]  
2-U
[10]   An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion [J].
Dong, Xingye ;
Huang, Houkuan ;
Chen, Ping .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (05) :1664-1669