Construction sequence modelling of continuous steel-concrete composite bridge decks

被引:17
作者
Dezi, L
Gara, F
Leoni, G
机构
[1] Marche Polytech Univ, Dept Architecture Construct & Struct, I-60131 Ancona, Italy
[2] Univ Camerino, PROCAM, I-63100 Ascoli Piceno, Italy
关键词
steel-concrete composite decks; fractionated casting; construction sequence; shrinkage and creep effects; finite element method;
D O I
10.12989/scs.2006.6.2.123
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a model for the analysis of the construction sequences of steel-concrete composite decks in which the slab is cast-in-situ for segments. The model accounts for early age shrinkage, such as thermal and endogenous shrinkage, drying shrinkage, tensile creep effects and the complex sequences of loading due to pouring of the different slab segments. The evolution of the structure is caught by suitably defining the constitutive relationships of the concrete and the steel reinforcements. The numerical solution is obtained by means of a step-by-step procedure and the finite element method. The proposed model is then applied to a composite deck in order to show its potential.
引用
收藏
页码:123 / 138
页数:16
相关论文
共 12 条
  • [1] *CEB FIP COM EUR I, 1988, CEB B INF, V190
  • [2] Dezi L, 2003, ADVANCES IN STRUCTURES, VOLS 1 AND 2, P1029
  • [3] CREEP IN COMPOSITE CONTINUOUS BEAMS .1. THEORETICAL TREATMENT
    DEZI, L
    TARANTINO, AM
    [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1993, 119 (07): : 2095 - 2109
  • [4] TIME-DEPENDENT ANALYSIS OF PRESTRESSED COMPOSITE BEAMS
    DEZI, L
    LEONI, G
    TARANTINO, AM
    [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1995, 121 (04): : 621 - 633
  • [5] DEZI L, 2003, B POTUA, V22, P170
  • [6] Ducret JM, 1999, STRUCT ENG INT, V3, P212
  • [7] Krauss P.D., 1996, Transverse Cracking in Newly Constructed Bridge Decks
  • [8] Effects of the slab casting sequences and the drying shrinkage of concrete slabs on the short-term and long-term behavior of composite steel box girder bridges. Part 1
    Kwak, HG
    Seo, YJ
    Jung, CM
    [J]. ENGINEERING STRUCTURES, 2000, 22 (11) : 1453 - 1466
  • [9] Effects of construction process and slab prestressing on the serviceability behaviour of composite bridges
    Marí, A
    Mirambell, E
    Estrada, I
    [J]. JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2003, 59 (02) : 135 - 163
  • [10] Numerical simulation of the segmental construction of three dimensional concrete frames
    Marí, AR
    [J]. ENGINEERING STRUCTURES, 2000, 22 (06) : 585 - 596