Back Analysis on Deformation of Concrete Faced Rockfill Dam Based on Prototype Monitoring

被引:0
作者
Ji, Shunwen [1 ]
Jiang, Lei [2 ]
Shi, Qihuan [1 ]
机构
[1] Zhejiang Inst Hydraul & Estuary, Zhejiang Key Lab Water Disaster Prevent & Reduct, Hangzhou, Zhejiang, Peoples R China
[2] Hydrochina Huadong Engn Corp, Hangzhou, Zhejiang, Peoples R China
来源
ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2 | 2013年 / 351-352卷
关键词
concrete face rockfill dam(CFRD); stress; deformation; prototype monitoring; back analysis;
D O I
10.4028/www.scientific.net/AMM.351-352.1302
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Material properties, calculation models and parameters are the main factors affect the simulation results of concrete face rockfill dams. According to the Baixi project, a 3D numerical model was built including the concrete face, filled rock, rock foundation and peripheral joint. Then, based on the deformation monitoring data during the construction and water storage period, the Duncan E-B model parameters were back analyzed. Finally, the sedimentation of dams, stress and strain of concrete face was simulated, and the actual working performance of concrete face and filled rock was studied.
引用
收藏
页码:1302 / 1305
页数:4
相关论文
共 9 条
[1]  
[Anonymous], CHINESE J ROCK MECH
[2]  
Duncan J.M., 1970, J SOIL MECH FDN ENG, V96, P1629, DOI DOI 10.1061/JSFEAQ.0001458
[3]  
Fan G. Q., 1993, GEOTECHNICAL ENG THE
[4]  
Fu Z.A., 1993, CONCRETE FACE ROCKFI
[5]  
Shen ZJ., 1998, J Hydraul Eng, V6, P1
[6]  
Wu Changbin, 2010, Water Resources and Power, V28, P94
[7]  
Zhou W., 2007, J HYDRAULIC ENG, V4, P389
[8]  
Zhu S., 2009, CHINESE J GEOTECHNIC, V31, P155
[9]  
Zhu S, 2011, ROCK SOIL MECH, V32, P3201